说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 青藏铁路格拉段
1.
Research on Lightning Protection and Grounding System in Qinghai-Tibet Railway Ge-La Segment;
青藏铁路格拉段防雷接地技术的研究
2.
Gela Segment of Qinghai-Tibet Railway is state key project.
青藏铁路格拉段是世界上海拔最高的高原铁路。
3.
Initial exploration into cost standard and efficiency reduction factor for Golmud - Lhasa section of Qinghai - Tibet Railway
青藏铁路格拉段工费标准及降效系数的初探
4.
Utilization Effect of wildlife passages in Golmud-Lhasa Section of Qinghai-Tibet Railway
青藏铁路格拉段野生动物通道利用效果
5.
Study on the Causes of Lining Failure and the Treatment Scheme for the Kunlunqiao Railway Tunnel
青藏铁路格拉段昆仑桥隧道衬砌裂损机理及整治技术研究
6.
The Study of Environmental Factors for Health of Workers that Working on Golmud-Lhasa Section of Qinghai-Tibet Railway Based on PLS
基于PLS的青藏铁路格拉段职工健康环境影响因素研究
7.
Reflection on Developing Common Military Transportation Service in Ge'ermu-Lhasa Section of Qinghai-Tibet Railway
青藏铁路格拉段开办正常军事运输业务问题探析
8.
Study of Vegetation Recovery Along the Qinghai-Tibet Railroad;
青藏铁路(格拉段)沿线植被恢复研究
9.
Enlightenment of Qinghai-Tibet Railway from Germu to Lhasa in Business;
青藏铁路格尔木—拉萨段运营的启示
10.
Study on Water & Soil Conservation at Qinghai-Tibet Railway Geermu-Lasa Section;
青藏铁路格尔木至拉萨段水土保持研究
11.
Design and Research of Locomotive Routing and Locomotive Crew Working System of Golumd-Lhasa Section of Xining-Lhasa Railway;
青藏铁路格尔木至拉萨段机车交路、乘务制度设计研究
12.
Study on Status Quo and Control of Water and Soil Loss at Qinghai-Tibet Railway Geermu-Lasa Section;
青藏铁路格尔木至拉萨段水土流失现状及其控制研究
13.
Studies on the Vegetation Characteristic and the Effects of Engineering Construction on Vegetation Diversity Along Qinghai-Tibetan Railway;
青藏铁路沿线(格拉段)植被特征及工程建设对植被多样性影响研究
14.
Thoughts of the Management and Operation of “Germu-Lasa” Section of Qinghai Tibet Line After It Is Completed;
青藏铁路格尔木至拉萨段修建后运营管理的思考
15.
The Sustainable Research of the Project of Qinghai-Tibet Railway on the South of the Tanggula Mountain;
青藏铁路唐古拉山南段工程项目可持续性研究
16.
Research on SF_6 Gas Insulated Electric Equipment Selection in Xining-Ge’ermu Section of Qinghai-Tibet Railway
青藏铁路西格段SF_6气体绝缘电气设备选型研究
17.
On June 29, 2001, with the approval of the Central Government, construction of the section between Golmud and Lhasa began as part of the second phase of the Qinghai-Tibet Railway project.
2001年6月29日,经中央政府批准,青藏铁路二期工程格尔木至拉萨段正式动工修建。
18.
The first section, from Beijing to Golmud in Qinghai Province, was completed in 1984.
1984年青藏铁路第一期工程-北京至青海格尔木段建成通车。