1.
The Study of Fast Making Switch for Synthetic Making Test Circuit under Full Voltage;
全电压合成关合试验快速关合开关的研究
2.
Study of Full-voltage Synthetic Making Test for High Voltage Switches
高压开关全电压关合试验相关问题研究
3.
Research on Full-rated Voltage Synthetic Making Test System for High Voltage Switches and Their Applications;
高压开关全电压关合试验系统及其应用研究
4.
Application of Phase Selection Switch in Low Voltage Electrical Apparatus Test
低压电器试验中选相合闸开关的应用
5.
Study on Relevant Experiments and Quantification of Coupling Strength for Coupled Thermo-Hydro-Mechanical Behaviour of Saturated Rocks;
三场耦合作用相关试验及耦合强度量化研究
6.
Problems in Impact Test for Test Temperature and Eligible Parameter of Absorbed Energy
关于冲击试验的试验温度和冲击吸收功合格指标问题
7.
Correlation of Ultrasonic and Stress of Polymer Modified Cement Concrete;
聚合物改性水泥混凝土声—应力相关性试验研究
8.
Test Analysis on the Coupling Relation of Stress Field and Seepage Flow Field on Loess;
基于黄土渗流场与应力场耦合关系的试验研究
9.
Thoughts on Building Comprehensive Experiment Zone for Tourism Reform and Development in Tengchong;
关于建设腾冲旅游改革发展综合试验区的思考
10.
Experimental data analysis and modeling study of bond-slip relationship between the bolt and cement-mortar
锚杆砂浆粘结-滑移关系的试验拟合分析与模拟
11.
Design of Microcomputer Controlling Test-Bed for Auto Combined Switch
微机控制的汽车组合开关检测试验台设计
12.
Grey Relational Degree Analysis on Hybridized Combinations in Maize Regional Trail
玉米区域试验新品种的灰色关联度综合评判
13.
Design of test system for image motion measurement based on joint transform correlator
联合变换相关器像移测量试验系统设计
14.
Studies on Correlation of Suhexin Nasal Inhalant in Vitro and in Vivo
苏合心鼻吸贴体内外相关性试验的研究
15.
Study of Experimental Testing and Evaluation Approaches on the Operation Performance of Automobile Multi-Function Switches;
汽车组合开关操作性能试验测试与评价方法研究
16.
Discussion on water injection test inapplicability to the permeability test for homogeneous earth dam
关于注水试验不适合均质土坝坝体渗透性测试的讨论
17.
clutch engagement speed test
离合器接合转速试验
18.
Correlation Analysis between Virtual and Real Vibration Test
虚拟振动试验与真实试验相关性分析