说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 墩顶位移
1.
Research and Development of the Field Monitoring System for the Displacement of the Top of Pier for the High-pier Bridge;
高墩桥墩顶位移现场监测系统的研发
2.
Discussion on Indicatrix of Displacement Observation Accuracy of Both the Anchorage Block and the Buttress in High-Head Diversion Power Plant
高水头水电站镇支墩位移观测精度指标的研讨
3.
Residual Displacement in Performance-based Seismic Design of Bridge Pier;
基于性能抗震设计中的桥墩残余位移问题
4.
A Study on Displacement of Pile Near the Abutment and the Subgrade Construction of Deep Soft Soil Foundation at Bridge-Head;
深厚软基上桥梁近台墩桩位移问题研究
5.
Study on Horizontal Displacement of Bridge Pier and Abutment in Deep Silt Stratification Areas;
厚淤泥层地区桥梁墩台的水平位移研究
6.
Influence on Main Arch Ring of Bridge Abutment Horizontal Displacement and Arch Axis Deformation;
墩台水平位移和拱轴线变形对主拱圈的影响
7.
Displacement and Seepage Monitoring Analysis for Huanren Massive-head Single-buttress Dam
桓仁单支墩大头坝位移及渗流监测分析
8.
The Target Displacement of Reinforced Concrete Pier and the Performance-based Seismic Design
钢筋混凝土桥墩的目标位移及基于性能的抗震设计
9.
Study of Displacement-based Seismic Design Method for RC Bridge Piers
以位移为基础的钢筋混凝土桥梁墩柱抗震设计方法研究
10.
Research on Calculation Method of Target Displacement in Single Column Systems of Reinforced Concrete Bridges
钢筋混凝土桥梁单墩体系目标位移计算方法研究
11.
Studying of the Wavelet De-noising Extraction Method for Pier Displacement Deformation in Construction Monitoring
施工监控中桥墩位移变形量的小波去噪提取法研究
12.
The relative displacement of the top can be reduced 51%;
顶层相对位移的控制效果达到51%;
13.
Analysis on Vertical Displacement Monitoring Data of Jicun Dam Crest
纪村大坝坝顶垂直位移监测资料分析
14.
automatic bilge block
自动定位及举升舭墩
15.
You can take a trick if you play the minor-suit top card.
如果你出低花顶张,你可以赢一墩牌。
16.
Construction technology for adjustment of 1750 t concrete box pier top deviation
1750t混凝土箱梁墩顶偏差调整施工工艺
17.
Features of displacement at the top of enclosure piles and analysis of the stiffness formula of bracing system
围护桩顶部位移特征及内支撑刚度公式辨异
18.
Theory Research of Soil Displacement on Extra-shallow-underground-pipe Jacking with Curve Construction at Construction;
超浅层曲线顶管施工阶段土体位移的理论研究