说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 混联水电站
1.
Joint optimization dispatching of a mixed hydropower station group based on dynamic electricity price;
动态电价下混联水电站群运营方式研究
2.
An improved discriminant criterion method (IDCM) derived form the discriminant criterion method is presented to solve long-term optimal scheduling operation problem of large-scale mixed hydropower systems.
采用改进判别式法求解大规模混联水电站库群发电优化调度问题。
3.
dam - diversion type hydroelectric power station
坝-引水混合式水电站
4.
Study on Combined Operation of Nuclear Power Plant and Pumped Storage Power Plant;
核电站与抽水蓄能电站联合运营研究
5.
Application of hydraulic slipform in concrete construction of combined intake tower for Jilintai I hydropower station
液压滑模技术在吉林台一级水电站联合进水塔混凝土施工中的应用
6.
A method for long term flow regime forcasting in a multi-storage system;
多水电站联合长期预报水情方法研究
7.
Design of RCC Gravity Dam of Suofengyin Hydropower Station
索风营水电站碾压混凝土重力坝设计
8.
Design of the mix proportion of RCC for Linhekou Hydropower Station
蔺河口水电站碾压混凝土配合比设计
9.
Study of RCC Arch Dam Structure of Longshou Hydropower Project;
龙首水电站碾压混凝土拱坝结构研究
10.
Seepage Flow Field Analysis of Silin RCC Dam;
思林水电站碾压混凝土坝的渗流分析
11.
Concrete Temperature Control Technology Applied to Double-curvature Arch Dam of Baotan Hydropower Station
宝坛水电站双曲拱坝混凝土温控技术
12.
Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station
小湾水电站双曲拱坝混凝土性能研究
13.
Concrete construction techniques for Three Gorges underground power hause
三峡水电站地下厂房混凝土施工技术
14.
Crack treatment on concrete arch dam of Xiakou Hydropower Station
峡口水电站工程混凝土拱坝裂缝处理
15.
Optimal Study on Cooperating Operation for Hydropower Stations of Siquan and Xihe River;
石泉、喜河水电站联合优化调度研究
16.
Selecting Aim Parameters of Francis Turbine About Containing Sand River
含沙河流水电站混流式水轮机目标参数选择
17.
Resurch on Structure Vibration of Hydropower House Excitated by Large-Sized Francis Turbine-Generator Set;
大型混流式机组水电站厂房结构水力激振研究
18.
Quality Control of Anti-scouring and Anti-abrasion Concrete for the Water Cushion Pool of Xiaowan Hydropower Station
小湾水电站水垫塘抗冲耐磨混凝土质量控制