1.
Construction Techniques for Loess Adverse Geographical Tunnels in Railway PDL
铁路客运专线黄土不良地质隧道施工技术
2.
Excavation Construction of the Poor Geological Section in ZhuanBao Tunnel
赚宝隧道不良地质区段开挖处治施工
3.
Research on the Technology for Construction of the Double-Arch Tunnel in the Adverse Geological Section;
不良地质地段双连拱隧道施工技术研究
4.
Construction Technology of Zhangjiawan Tunnel in Karst Area of South Sichuan
川南地区岩溶不良地质张家湾隧道施工技术
5.
Application of the land sonar method in tunnel defective geological advanced prediction
陆地声纳法在隧道不良地质超前预报中的应用
6.
Study on Interaction Mechanism of Slope Adverse Geological Body and Tunnel at the Entrance of the Second Yaotou Tunnel
窑头2号隧道进口段斜坡不良地质体与隧道相互作用机理的研究
7.
Construction Crucial Technique of the Long-span Tunnel Portals in Unfavorable Geological Condition;
不良地质条件下大跨度隧道洞口施工关键技术
8.
On construction technology in shallow buried geological section of Daobaogou in Zhun-Shuo railway
准朔铁路岛宝沟隧道浅埋不良地质段施工技术
9.
Excavation of roadway tunnel in complicate geological conditions of poor surrounding rock
复杂条件下不良地质围岩公路隧道开挖施工
10.
Research on the bad geology and collapse construction technology of Shang Hu-yu tunnel
上虎峪隧道不良地质及塌方施工技术研究
11.
Study on Forecasts and Treatment of the Shenjia Slope Tunnel Adverse Geological
申家坡隧道不良地质超前预报与治理研究
12.
Adverse Geology in Xishan Tunnel and Corresponding Construction method
论西山隧道不良地质及相应的施工方法
13.
On the bad geological phenomenon in Yufeng mountain tunnel construction and treatment measures
玉峰山隧道施工中不良地质现象及处理措施
14.
Research on Prewarning System for Unfavorable Geologies in Tunnel Construction Based on Comprehensive Advanced Geological Prediction
基于综合超前地质预报的隧道施工不良地质预警体系研究
15.
Research on the Forward Simulation of Detecting Abnormal Geological Body Wihich Contain Aboundant Water in Front of Tunnel Face;
隧道前方富水不良地质体地电磁效应理论正演研究
16.
Electrical-Geological Parameters of the Adverse Geological Zone in Front of Working Face in Tunnel and Sensitivity Analysis;
隧道掌子面前方不良地质体地电参数敏感度分析
17.
Stability Analysis of the Unfavorable Geologic Section with Pre-grouting Reinforcement in Subsea Tunnel at Jiaozhou Bay
胶州湾海底隧道预注浆加固不良地质段的稳定性分析
18.
Re-assessment and Dynamic Control of Adverse Geological Risks in Extra-long Xuefengshan Railway Tunnel
雪峰山特长铁路隧道不良地质风险再评估与风险动态管理