说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡泄洪坝段
1.
The Research of System Dynamic Optimizing Control of Concrete Construction Management of Three Gorges Sluicing Dam;
三峡泄洪坝段混凝土施工管理系统动态优化控制研究
2.
According to presentations, the second phase project of the Three Gorges Project mainly includes bids such as the flood discharge dam, the factory protection dam and the factory buildings, etc.
据介绍,三峡工程二期工程主要包括泄洪大坝、厂房大坝及厂房等标段。
3.
Flood water is discharged through the sluice on the Three Gorges Dam on June 19, 2007.
2007年6月19日随着三峡大坝的泄洪,滞留了多天的洪水倾泻而下。
4.
They are used for connecting the sluice of the Three-gorge Dam and the gantry or disconnecting them.
该液压系统为三峡大坝泄洪闸实现与门机联接或脱开的系统。
5.
INFLUENCE OF FLOOD DISCHARGE AND SAND SCOURING OF THREE GORGES RESERVOIR AND GEZHOUBA RESERVOIR ON DEFORMATION OBSERVATION AT YICHANG SEISMOSTATION
三峡与葛洲坝水库泄洪冲沙对宜昌台形变观测的干扰
6.
Stability Analysis of Ogee Section at the End of Discharge Trough of Spillway of Earth-rock Dam on Deep Soft Foundation
深厚软基上土石坝坝体溢洪道泄槽末端反弧段的稳定分析
7.
Three-Dimensional Numerical Simulation on Flood Field of Riverbed Hydropower Station
河床式电站大坝泄洪流场的三维数值模拟
8.
Experimental Studies on Aerator With Vertical Drop and Lateral Sudden Enlargement form for Three Grorges Project?s Outlets
三峡工程泄洪深孔突扩跌坎式掺气的试验研究
9.
Model study and prototype observation on deep outlets of Three Gorges project
三峡泄洪深孔选型试验研究与工程效果
10.
Research on contact of powerhouse′s longitudinal joint of TGP
三峡工程厂房坝段纵缝接触问题研究
11.
An analysis of aseismic dynamic characteristic of workshop section in the Yangtse Gorges dam
三峡大坝厂房坝段结构抗震动力特性分析
12.
Property analysis on measured seepage of the right-bank dam foundation at Three Gorges Project
三峡工程右岸坝段实测坝基渗流性态分析
13.
Construction of the Crown Concrete of the Intersection Section of Diversion Tunnel and Middle Flood Discharging Tunnel in the Jishi Gorge Hydropower Station
积石峡水电站导流洞与中孔泄洪洞交叉段顶拱混凝土施工技术
14.
Study on the Static Characteristics of the High Arch Dam Body and the Vibration Induced by Discharge Flow;
高拱坝坝身静力特性及泄洪振动研究
15.
Dam block14 and its foundation of the Three Gorges Left-bank Hydropower Station are chosen as a key part for the safety monitoring system.
三峡大坝左厂14号坝段及其基础是三峡大坝安全监测系统选择的关键部位。
16.
Numerical simulation of dissolved oxygen concentration in the downstream of Three Georges Dam
三峡工程坝身泄流下游水体溶解氧浓度数值模拟
17.
A PRELIMINARY ANALYSIS ON THE EFFECT OF DAMMING IN SANXIA ON WATER QUALITY IN THE YICHANG REACH OF YANGTZE RIVER
三峡建坝对长江宜昌段水质影响的初步分析
18.
Temperature Control and Anti-crack Technique in the Construction of LOT II A of the Left Bank Plant Section of the Secondary Phase of the Three Gorges Project
三峡二期工程左岸厂房坝段ⅡA标段混凝土温控及防裂技术