说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大悬臂
1.
The Crack-mending and Intensifying of Cantilevered End of Cantilever Hollow Pier
大悬臂空心墩悬臂端结构裂缝病害的加固处理
2.
KEY TECHNIQUES IN CONSTRUCTION OF LARGE CANTILEVER STEEL STRUCTURE OF CCTV MAIN BUILDING
CCTV主楼大悬臂钢结构施工关键技术
3.
TEST ANALYSIS OF INSTANTANEOUS ANCHORAGE LOSS OF PRESTRESSED WITH LONG CANTILEVER BEAM
大悬臂梁预应力瞬间锚固损失的测试分析
4.
Special Monitoring for Huge Cantilever of CCTV Main Tower during Construction
CCTV主楼双塔间大悬臂施工过程专项监测
5.
Mechanical Behavious & Experimental Analysis of Wide Curved Box-Girder
大悬臂弧线底板箱梁桥受力与试验分析
6.
Hanging Basket Pouring Method in the Cantilever Section Construction of the Hanjiang West Creek Bridge
韩江西溪特大桥悬臂段挂篮悬灌法施工技术
7.
Most cantilever bridges have two arms of truss structure that meet or support a section between them.
大多数悬臂桥都有两个桁架臂用以对接或支撑两臂之间的桥段。
8.
Cantilever Construct Technology for Main Box Girder of Fengpu Bridge;
奉浦大桥主桥箱梁悬臂浇筑施工技术
9.
Monitoring Techniques of Cantilever Pouring Construction of Mashuihe River Bridge
马水河特大桥悬臂浇筑施工监测技术
10.
The Construction Control Analysis of Long-span Cantilever Construction for Continuous Rigid Frame Bridge
大跨度连续刚构桥悬臂施工控制分析
11.
Cantilever construction linetype control of Guangxi Zhenliuyou river large Bridge
广西镇流右江大桥悬臂施工线形控制
12.
BOUNDARY INTEGRAL FORMULA FOR BENDING OF CLAMPED SEMI-INFINITE PLATE
悬臂半无限大板弯曲的边界积分公式
13.
Cantilever casting construction of large-span and large-cross-section continuous box girder of passenger-dedicated line
客运专线大跨度大截面连续箱梁悬臂浇筑施工
14.
Properties Research on a Large Annular Stadium Roof Structure with Cantilever Beam String;
大型环状悬臂型张弦梁挑蓬结构的性能研究
15.
Cantilever Construction Control of Reconstruction Projects of Dalian Fast Railway 3# Line Engineering;
大连快轨三号线续建工程悬臂施工控制
16.
Study on Cantilever Construction Control of Long Span Prestressed Concrete Continuous Girder Bridges;
大跨度预应力混凝土连续梁悬臂施工控制研究
17.
Construction Control of the Extending Line of Dalian Fast Railway 3# Line Engineering;
大连快轨三号线延伸线工程悬臂施工控制
18.
Stress Analysis on Stages of Cantilever Canstruction of Large-Span Continuous Beam Bridges
大跨度连续梁桥悬臂施工阶段的应力分析