说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 保护工程设计
1.
Design of Ship-Transfer Waibaidu Bridge Overhaul Project(to be continued)
外白渡桥船移大修保护工程设计(上)
2.
The Design and Construction of Microprocessor-based Relay Protection of a 10KV Electricity Substation in a School;
某高校10KV变配电站的微机继电保护工程设计与建设
3.
The overall planning standard of the engineering of the natural reserves
自然保护区工程总体设计标准
4.
Code for environmental protection design of port engineering
港口工程环境保护设计规范
5.
Code for environmental protection design of railway engineering
铁路工程环境保护设计规范
6.
Discussion on legal protection of copyright of engineering design files;
浅谈工程设计档案著作权的法律保护
7.
The discussion of the fire protection design of the remedy project of TiYu Building
体育大厦保护修缮工程防火设计探讨
8.
The IPRs protection,confidentiality and its practice in mechanical engineering design;
机械工程设计的知识产权保护、保密与实践
9.
Design and Construction of Renovation Project for Protection of Existing along Ancient Canal
古运河旧驳岸保护性修缮工程的设计与施工
10.
Design Method and Experimental Study on the Roll-over Protective Structures for Engineering Vehicles;
工程车辆翻车保护结构设计方法与试验研究
11.
Reconnaissance Design Project of Cultural Relic Protection: Yuanhe Temple in Wudang Mountain;
武当山元和观文物保护工程勘察设计方案
12.
Environmental Protection Design of Wanjiazhai Yellow River Diversion Project(North Main)
万家寨引黄入晋工程北干线环境保护设计
13.
Design of Water Environment Protection Engineering of Caiyun Lake in Taohuaxi River Basin
桃花溪流域彩云湖水环境保护工程的设计
14.
Design and Realization of the Information Management System of Natural Forest Resource Protection Engineering
天然林保护工程信息管理系统的设计与实现
15.
- At the design stage of this railway line, protection of the ecological environment was the deciding factor in the plan for the project.
——铁路建设的设计阶段,生态环境保护成为工程方案的决定因素。
16.
Wildlife Protection and Nature Reserve Development Program.
野生动植物保护及自然保护区建设工程。
17.
Plan and executive major maintenance project of electrical equipment and power system.
计划并执行电气设备及电力系统的重点保养维护工程。
18.
The facilities for environmental protection of a coal mine construction project must be designed, constructed, checked and accepted, and put into use simultaneously with the main project.
煤矿建设项目的环境保护设施必须与主体工程同时设计、同时施工、同时验收、同时投入使用。