说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 桩体强度
1.
Analysis of influence of ground upheaval on the strength of DCM
深搅桩隆起量对桩体强度的影响分析
2.
Strength increase law of pile around soil and calculation of single pile bearing capacity
桩周土体强度增长规律及单桩承载力的计算
3.
Research on soil fatigue and restoration during deep penetration large diameter pile driving
大直径超长桩打桩过程中桩周土体的疲劳与强度恢复
4.
Rock strength characteristics and research on rock-socketed pile-tip ultimate resistance
岩石强度特性与嵌岩桩桩端极限阻力
5.
Strengthening effect of total pile lateral friction by improving rock or soil strength at pile tip
桩端岩土强度提高对超长桩桩身总侧阻力的强化效应研究
6.
An in Vitro Study: Effect of Cyclic Loading to the Fracture Resistance of Teeth Restored with Different Post and Core Systems;
循环加载对不同桩核修复后牙体抗折强度影响的对比研究
7.
Study of tooth rupture strength after repairing upper incisor with three different dowel system
对3种桩核系统修复上颌中切牙后牙体抗折强度的研究
8.
An in vitro study of different cements' influence to the fatigue strength of pulpless teeth restored with post-and-core crowns
不同粘结剂对桩核冠修复后牙体组织抗疲劳强度影响的实验研究
9.
Structural Analysis of Jack-up Platform Spud Tank Based on the Pile-Soil Interaction;
基于桩土相互作用的自升式平台桩靴强度研究
10.
Prevention Measures on Not Enough Concrete Strength of the Top Drilling and Pouring Stake;
钻孔灌注桩桩顶混凝土强度不足的预防措施
11.
Quality control of the static pressed pile of high strength prestressed concrete pipe pile
高强度预应力混凝土管桩静力压桩的质量控制
12.
Analysis of rock-socketed pile uniaxial compressive strength and bearing capacity of pile tip at three dimensional effects
嵌岩桩单轴抗压强度和三维作用下桩端承载力
13.
Retention of Selected Cores to All-ceramic Posts and Fracture Resistance of the All-ceramic Posts in Post-and-core System;
两段式全瓷桩核桩—核间固位力及全瓷桩核断裂强度的研究
14.
Experiments of Driven Pile Control for Static Pressure on PHC Pipe Pile
静压式预应力高强度混凝土管桩沉桩控制压桩力的试验分析
15.
Research on the Detection of the Intensity of the Pouring Stake Concrete with Ultra-sound Method;
超声法检测灌注桩混凝土强度的研究
16.
The Analysis of Cantilever Strength of ZYB600F Hydraulic Static Pile Engine Base on Cosmos;
ZYB600F型液压静力压桩机悬臂强度的分析
17.
Treatment Method of the Pile Foundation s Intensity Insufficient;
康复中心桩基础强度不足的处理方法
18.
Supervision and Monitoring of Low-strength Concrete Piles Composite Foundation
低强度混凝土桩复合地基的施工监理