1.
urban transport organization scheme in the course of subway construction:A case of No. 2 subway in Nanjing;
城市地铁站点施工期交通组织方案研究——以南京市地铁二号线为例
2.
Subway-station,deeping foundation,construction safety supervision control points
地铁车站深基坑施工安全监理控制要点
3.
Difficulties in the Design of Tianjin Metro Line 3 Station
天津地铁3号线营口道站施工设计难点
4.
Investigation on Construction Technology and Security of Underpassing Metro Station Crossing Railway Ground;
地铁车站下穿铁路站场施工技术与安全性研究
5.
Construction Technology of Subway Station with PBA Method and Settlement Analysis
地铁车站PBA工法施工技术及沉降分析
6.
Construction Control of a Newly-Built Subway Station Undercrossing the Existing Subway Tunnel
暗挖地铁车站下穿既有地铁隧道施工控制
7.
Research on the Deep Excavation Effect of the Interchanging Metro Station;
地铁换乘枢纽后建车站施工影响研究
8.
The Research on the Transition Behaviors of Mechanics during the Center Drift Method in Subway Station Construction;
地铁车站中洞法施工力学行为的研究
9.
Research on the Construction Schemes of Metro Station Driven with Enlarging Shield Tunnels;
盾构扩挖修建地铁车站施工方案研究
10.
Feasibility Analysis of the Subway Station Topdown Construction at Harbin Electric Meter Factory;
哈电表厂地铁站逆作施工可行性分析
11.
Undermining Construction Technique Research on Suzhou Street Subway Station of Beijing City;
北京地铁苏州街站暗挖施工技术研究
12.
Undermining Construction Technique Research on Dongwuyuan Subway Station of Guangzhou City
广州地铁动物园站暗挖施工技术研究
13.
Study on the Mechanical Behaviors of Pit Excavation of Subway Station in Chengdu
成都地铁车站基坑施工过程力学研究
14.
Construction technology of the ultra-shallow large span and subsurface excavation subway station
超浅埋大跨暗挖地铁车站的施工技术
15.
The new Austrian method construction monitoring measurement of large section subway station
大断面地铁车站新奥法施工监控量测
16.
CONSTRUCTION TECHNOLOGY ON SOIL-BODY REINFORCEMENT OF SEPARATED ISLAND PLATFORM METRO STATION
分离岛式地铁车站土体加固施工技术
17.
Mechanical Simulation and Analysis of Metro Station on the New Line Cross the Existing;
地铁新线车站穿越既有线车站的施工力学分析
18.
The underground continuous wall special sector guide wall construction of some subway station
某地铁车站地下连续墙特殊地段导墙的施工