说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水坝船闸
1.
Fracture Dynamics Analysis for an Event of Failure in the Gudgeon Link for the Miter Gate of a Dam
水坝船闸人字门拉杆破坏的断裂动力学分析
2.
A fracture dynamics analysis is given to an accident on a gudgeon link of the miter gate of a dam.
对某水坝船闸人字门拉杆断裂事故进行断裂动力学的定性与定量分析。
3.
Study on the Types of Lock Filling and Emptying Systems Adapted to High Dam Navigation
适用于高坝通航的船闸输水系统型式探讨
4.
Finite Element Analysis of Stoplog of Navigation Lock No.2 for Gezhouba Hydraulic Project
葛洲坝水利枢纽二号船闸叠梁门有限元分析
5.
In combination with the construction practice of Xinba Lock, this paper introduces culvert construction of tile Lock's upper lock head and preventive measures for cracks.
通过新坝船闸施工实践,介绍了船闸上闸首输水廊道施工及预防裂缝产生所采取的措施。
6.
The navigation facilities at the Shulkou project comprise a one-way three-flight ship lock and a oneway 2×500-ton ship lift.
水口水电站航运过坝采用一线三级船闸和一线2×500t垂直升船机。
7.
Study on Navigation Condition of Down-stream Channel of Dajiang Lock of Gezhouba Project
葛州坝大江船闸下游航道通航水流条件试验研究
8.
Finite Element Analysis on the Emergency Gate of No.2 Navigation Lock of Gezhouba Water Conservancy Project
葛洲坝水利枢纽二号船闸事故检修门有限元分析
9.
filling and emptying system
(船闸的) 充水和放水系统
10.
lock filling and emptying system
船闸充水与泄水系统
11.
Gezhouba dam is one of the largest sluice gates on a inside river in the world.
葛洲坝是世界上最大的内河船闸之一。
12.
Other factors that may affect dam selection are roadways, fishway, locks, and log passages.
其他影响选坝的因素有道路,鱼道,船闸和筏道等。
13.
Ground Treatment of Rubber Dam Ledgerwall of South-Fei River Sluice and Rubber Dam Project;
合肥市南河船闸、橡胶坝工程橡胶坝底板地基处理
14.
Energy dissipation effect and mechanism of open ditch energy dissipater in high-head lock
高水头船闸闸室明沟消能效果及机理分析
15.
Design of Drop-tilting Gates at Dahua Hydropower Station and the Layout of Hoist
大化水电站船闸卧倒闸门设计及启闭机布置
16.
Study on filling and emptying system of Guiping second-line shiplock chamber wall structure
桂平二线船闸输水系统与闸室墙结构方案研究
17.
Study on Flow Pattern in Ship Lock Chamber of Letan Hydropower Station and Countermeasures
乐滩水电站船闸闸室流态问题的研究与对策
18.
Arrangement of lock bottom long-culvert filling & emptying system of Guiping Second-lane lock
桂平二线船闸闸底长廊道输水系统布置研究