说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 主墩承台
1.
The Analysis of Main Pier Platform's Heat of Hydration of Babaaoyue Bridge
巴巴奥约河大桥主墩承台水化热分析
2.
Construction on Steel Boxed Cofferdam of Middle Main Pier Platform in Ronggui Shuidao Bridge
容桂水道特大桥中主墩承台钢套箱围堰施工
3.
On the design of integrated steel hang box cofferdam and its construction technology on Shangtang river
上塘河主墩承台整体式钢吊箱围堰设计与施工
4.
Temperature Control of Construction of Massive Concrete for Main Pier Pile Caps of Secondary Navigable Spans of Sutong Bridge
苏通大桥辅桥主墩承台大体积混凝土施工温度控制
5.
Large Volume Concrete Construction Quality Control of Frusta Bearing-base in Yesanhe Bridge
野三河特大桥主墩承台大体积混凝土施工质量控制
6.
The massive concrete proportion design for main pier bearing platform of Sifangtai Bridge in winter construction was mainly introduced.
本文重点介绍了四方台大桥主墩承台大体积混凝土冬季施工配比的设计。
7.
This article revolves around the design and construction technique involving the second main tower pier of the Minjiang Bridge, its platform, suspension box, and cofferdam.
本文主要介绍了闽江大桥2#塔墩承台吊箱围堰的设计及施工方法。
8.
Design and Construction of Steel Pipe Cofferdam for Pile Cap of Main Pier No.5 of Edong Changjiang River Bridge
鄂东长江大桥主5号墩承台钢管围堰设计与施工
9.
The paper introduces design and construction of steel sleeve box for main pier's base in water at Shaokou Bridge, puts forward the ideas to pledge steel box subseal perfect.
介绍沙口大桥主墩水中承台的钢套箱设计与施工,对如何保证套箱封底成功提出了见解。
10.
Research into Construction Control of Long-span Beam Bridge with High Pile-Cap and Deepwater Pier;
大跨高桩承台深水墩梁桥施工控制研究
11.
On the design and construction of No.1 pier cap of Xinshao the second bridge over Zijiang
新邵资江二桥1号桥墩承台设计和施工的探讨
12.
Influence on Main Arch Ring of Bridge Abutment Horizontal Displacement and Arch Axis Deformation;
墩台水平位移和拱轴线变形对主拱圈的影响
13.
Design of Boring Platform for Main Pier No.5 of Edong Changjiang River Bridge
鄂东长江大桥主5号墩钻孔施工平台设计
14.
Experimental Research on Nine-pile Double Thin-wall Pier's Thick Caps Using Strut-and-tie Model
九桩双薄壁墩厚承台空间桁架模型现场试验研究
15.
Experimental Study on Local Scour Protection of Large-scale Pile Platform Pier Foundation of Su-Tong Bridge
苏通大桥大型桩承台桥墩基础的局部冲刷防护试验研究
16.
Design Study and Application of Cellular - Shaped Floating Steel Coffer Platform to the Construction of Main Pylons in Main Navigation Span of Donghai Bridge
东海大桥主通航孔主塔墩蜂窝状钢浮套箱平台的设计研究与应用
17.
Research on Displacement of Piers of Concrete-filled Steel Tubular Tied Rigid Frame Through Arch Bridge on Construction Stages;
下承式钢管混凝土刚架系杆拱桥施工阶段主墩变位的研究
18.
The effect of the main parameters of caps of steel fiber concrete on bearing capacity
钢纤维混凝土承台主要参量对承载力的影响