说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 昭平水电站
1.
Problem of hollow valve at shiplock of Zhaoping Hydropower Plant and solution
昭平水电站船闸空腹阀门存在的问题与处理
2.
Upgrade of trash raking system for Zhaoping Hydropower Station
广西昭平水电站清污排污系统技术改造
3.
Mid-Long Term Runoff Forecast Model of Zhaopingtai Reservoir;
昭平台水库入库流量中长期预报模型
4.
Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement
太平湾电站变电站水泥杆裂缝分析及加固
5.
The Applications of Water-prospecting by Electrical Method in Pingguo Substations
电测深法在平果变电站找水中的应用
6.
Analysis of a maloperation of transformer's backup protection in 110 kV Zhaodong station
昭东电站110kV主变后备保护拒动原因分析
7.
Optimization of Hydropower Tunnel Upper Flat Pipe Section Support for Hydropower Station
水电站引水发电隧洞上平管段支护优化研究
8.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
9.
Experimental investigation of the side wall deformation in the PCP region of a utility boiler
电站锅炉水平侧包墙变形的试验研究
10.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
11.
Study on the Water Seal Layout at the Bulb Tubular Powe Station
灯泡贯流式水电站厂房水平止水布置研究
12.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
13.
floating power barge
水上动力站水上发电站
14.
JCS Choshi Radio
日本jcs昭治电台
15.
Research and Realization of Cross-Platform Hydropower Station Based on Web;
基于web的跨平台水电站系统研究与实现
16.
Strengthening the Up-to-standard Operation Management,Improving the Overall Level of Power Station Handover;
抓好达标投产管理 提升电站整体移交水平
17.
Put into Operation for Standards and Effect of Pingban Hydropower Station Project;
平班水电站工程达标投产工作体会及成效
18.
Research on Economic Operation Application System for Yanshan Hydropower Station under Monitoring Platform
监控平台下燕山水电站经济运行应用系统研究