说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 引黄北干线
1.
Discussion on Accident Causing Shutdown of TBM in Excavation of Tunnel of Northern Main Line
引黄北干线某隧洞TBM卡机事故探讨
2.
On Planning of Regulation Reservoirs in North Main Line of YRDP
万家寨引黄北干线调节水库规划问题
3.
Water Price Design of the North Arterial Project of Yellow River Diversion in Wanjiazai;
对万家寨引黄北干线工程水价设计的思考
4.
Water Quality Modeling and Control Study of Sang Gan River in the North Line of the Yellow River Diversion Project
引黄北干线输水工程桑干河道水质模拟与控制研究
5.
Research on the Loess Collapsibility Project Geology of Water Conveyance Line in the North Trunk of Yellow River Diversion Project
引黄北干输水线路黄土湿陷性工程地质研究
6.
Analysis on Constructing PCCP Factory in North Main Line Project of Wanjiazhai YRDP;
万家寨引黄工程北干线PCCP管厂的建设分析
7.
Evaluation of Reservoir Seepage for the Daliang Yellow River Diversion Project;
引黄入晋工程北干线大梁水库渗漏问题研究
8.
Environmental Protection Design of Wanjiazhai Yellow River Diversion Project(North Main)
万家寨引黄入晋工程北干线环境保护设计
9.
Discussion on the Influences of the Construction of No.1 Tunnel of Northern Trunk in Wanzhanjiazhai YRDP on the Wells in Some Villages along the Line
万家寨引黄工程北干线1号隧洞施工对沿线部分村庄水井的影响
10.
On the Structure Calculation of Buried Culvert of Datong Section,Northern Route of Shanxi Wanjiazhai YRDP
山西省万家寨引黄工程北干线大同段埋涵结构计算
11.
Scheme Comparison of Transfer and Storage Reservoir in the North Trunk of Diversion Yellow River Water into Shanxi Project in Wanjia Village Shanxi Province
山西省万家寨引黄入晋工程北干线调蓄水库方案比选
12.
Effects Analysis of Diverting Water and Sand of Warping Tests in Xiaobeiganliu of the Yellow River;
黄河小北干流放淤试验引水引沙效果分析
13.
The Application of Geosynthetics in the Storage Reservoir of Yellow River Diversion Project
土工合成材料在引黄北干调节水库中的应用
14.
Analysis on the Seepage Deformation of the Dam Foundation of Shangxizhuang Reservoir in North Trunk of YRDP(Yellow River Diversion Project)
引黄北干尚希庄水库坝基渗透变形分析
15.
The Water Price Analysis of Water Supply from The South Main Line of YRDP to Jinzhong Plain Region;
万家寨引黄南干线向晋中平川区供水水价分析
16.
Application of full-face TBM on the international tender sections II and III of the southern artery in the Yellow River diversion project
全断面隧洞掘进机在引黄工程南干线国际Ⅱ、Ⅲ标中的应用
17.
Analysis on Claim;
万家寨引黄工程总干线一、二级泵站防火喷涂项目索赔分析
18.
Analysis on the Observation Data of Groundwater Level of Secondary Pumping Station on South Main Line of YRDP (Yellow River Diversion Project)
引黄工程南干线二级泵站地下水位观测资料分析