1.
Determination of Project Price after Engineering Subcontract is Confirmed Invalid
工程转包合同被确认无效后工程价款的确定
2.
The contractor for the new school building gave out subcontracts to a plumber , a steam fitter, etc.
承造学校新建筑的人又将工程转包给铅管工人,汽管装配工人等等。
3.
Preliminary Views on the Illegal Subcontracting and Contract Transformation in Contract Construction
谈建筑工程中的违法分包及非法转包
4.
PRELIMINARY DISCUSSION ON TRANSFER CONTRACTING OF CONSTRUCTION ENGINEERING PROJECT AND ITS UNLAWFUL DIVISION;
浅议建设工程项目中的转包和违法分包
5.
Internal transfer pricing of general contractors
工程总承包商的内部转移定价问题探讨
6.
Scope of the Works: SUBSTRUCTURE WORKS (as more fully detailed elsewhere in these subcontract documents)
工程范围:地下工程(详情请见本转包合同其它文件)
7.
International Market for Contracted Projects and the Trend of Contracting Workin;
国际工程承包市场与承包工程新趋势
8.
A sub-contractor is prohibited from further sub-contracting its contracted work.
禁止分包单位将其承包的工程再分包。
9.
Contracts for construction projects include contracts for survey, design, and construction.
建设工程合同包括工程勘察、计、工合同。
10.
I do contract work for the Far East.
我承包远东公司的工程。
11.
China Foreign Undertaking Contract Project Chamber of Commerce
中国对外承包工程商会
12.
Contract for Works of Civil Engineering Construction
土木建筑工程承包合同
13.
However, your IT staff, including network engineers and programmers, will be most affected by the change to the new protocol.
然而,IT职员(包括网络工程师和程序员)受向这个新协议转变的影响最大。
14.
To arrange for(contracted work) to be done in portions by others; subcontract.
转包合同把(签了合同的工作)分包给别人;转包合同
15.
Operating Sequence of Project Completion and Settlement for General Contracting Project
工程总承包项目竣工、结算操作程序
16.
The electrical work has been subcontracted to Smith Ltd..
电工工作已转承包给史密斯有限公司。
17.
The Contractor shall not subcontract the whole of the works.
承包商不得将整个工程分包出去。
18.
He jobbed out the contract to a number of small outfits.
他把承包工程分包给许多小单位。