1.
The Chu-song rockfill dam with concrete face slab locates on oxygen lacking Tibet plateau, where the climate is cold with large temperature difference day and night.
西藏楚松混凝土面板砂卵石坝座落在寒冷缺氧的高原,昼夜温差大。
2.
Reliability Analysis on Seepage Stability of Concrete Face Sand-Gravel Dam;
混凝土面板砂砾石坝渗透稳定的可靠性分析
3.
Research on Slab Deformation Characteristics of Concrete Faced Rockfill Dam;
混凝土面板堆石坝面板变形特性研究
4.
Design of submerged concrete high toe wall of CFRD
混凝土面板堆石坝潜没式混凝土高趾墙设计
5.
Construction of concrete faced rockfill dam on an existing concrete gravity dam--introduction of New Yesa Dam in Spain
利用旧混凝土重力坝改建混凝土面板堆石坝——西班牙的新耶撒坝
6.
Technical code for joint seal of concrete face rockfill dam
混凝土面板堆石坝接缝止水技术规范
7.
The Structural Design of Overflow Concrete Face Rockfill Dam
溢流混凝土面板堆石坝结构设计研究
8.
Design and Study on Peripheral Joint of Concrete Faceplate Maraine Dam;
混凝土面板堆石坝周边缝的设计研究
9.
The Study on Stresses and Deformations of Concrete-face Rock Fill Dam;
混凝土面板堆石坝应力变形特性研究
10.
An algorithm for slope paving of concrete faced rockfill dams
混凝土面板堆石坝的一种坝坡修整算法
11.
Research on Stress and Strain of Concrete Face Rockfill Dam
钢筋混凝土面板堆石坝面板应力应变研究
12.
Study on Concrete Face Construction of GuDongKou. Concrete Face Rock-fill Dam;
古洞口面板堆石坝面板混凝土施工工艺研究
13.
The Concrete Face Rock-Fill Dam Two-Layered Slab Anti-Crack Engineering Research;
混凝土面板堆石坝双层面板抗裂措施研究
14.
Transient seepage analyses for Gouhou concrete faced rockfill dam were conducted using the unsaturated soil seepage theory.
利用非饱和土渗流理论,对沟后混凝土面板砂砾石坝进行瞬态渗流数值模拟。
15.
The Test and Study of Small Filled Spall of the Concrete Faced Rock-Fill Dams (CFRD);
小粒径石料填筑混凝土面板堆石坝技术研究
16.
During the rehabilitation construction of 1985,the asphalt facing was covered by the sand gravel with a stone pitching surface.
1985年对该坝采用砂砾石料覆盖和沥青混凝土面板加固等综合措施进行了处理。
17.
CFRD Material Zoning Optimization and 3-D FEM Analysis on Dam Deformation Character;
混凝土面板堆石坝坝料分区优化及坝体变形特性三维有限元分析
18.
The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Reba dam site
西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例