1.
An Analysis of Horizontal Cracks on the Upstream Slope and the Heel of the Gravity Dams in Terms of Fracture Mechanics
重力坝上游坝面和坝踵水平裂缝的断裂力学分析
2.
There are horse shoe vortex around spur dikes and Karman vortices behind spur dikes.
发现在丁坝的上游会形成马蹄涡 ,在丁坝的背风面会形成卡门涡 .
3.
Study on Calculation Method for Surface Curves Above Single Row Permeable Pile Groin
单排井柱桩透水丁坝上游水面线计算研究
4.
Research on the Compensation of Concrete Crevice Treatment on the Upper & Down Stream Dam Surface of the Three Gorges Project;
三峡二期工程大坝上下游面混凝土裂缝处理变更补偿问题探析
5.
Pre-stressed Anchorage Project Construction Technology for Middle Orifices Dam Section of Project in Upstream Surface of Yunfeng Hydropower Station Dam
云峰水电站大坝上游面加固工程中孔坝段预应力锚索工程施工工艺
6.
The Measures of the Risk Elimination & Reinforcement of Lingdong Reservoir Upstream Dam Slope
灵东水库大坝上游坝坡除险加固处理措施建议
7.
Additional length of seepage path of upstream slope of dams and levees on impervious strata
不透水地基上堤坝上游坡的附加渗径
8.
As the dam rose, so did the waters behind it, leaving them no choice but to go.
随着大坝渐渐升高,上游的水面也逐渐升高,居民们最终迫不得已,只好离开。
9.
Study on the Seepage Characteristics and Analysis Model of Concrete Faced Rock-fill Dam Built on Alluvium Deposits;
覆盖层上面板堆石坝坝坝区渗流场特性及分析模型研究
10.
ANALYSIS OF UNFAVOURABLE SITUATIONS FOR CHENCUN ARCH DAM WITH UPSTREAM DISPLACEMENT AT ARCH CROWM
陈村拱坝拱冠坝块向上游位移最不利运行状态分析
11.
Study on Shaking and Jetting Reinforcement Technology in the Upstream Sand-Shell Slope of Andi Dam in Linyi City, Shandong Province;
岸堤水库心墙砂壳坝上游坝坡振冲加固技术研究
12.
FEASIBILITY STUDY ON CONSTRUCTION OF HIGH DAM AT MIDDLE REACHES OF JINSHA RIVER WITH THICK RIVERBED DEPOSIT
金沙江中游上江坝址河床深厚覆盖层建高坝可行性探讨
13.
Application of Dam Safety Monitoring Information Management System in Huanghe Upper Stream Hydropower Plant Several Dams Management
大坝安全监测信息管理系统在黄河上游水电站多坝管理中的应用
14.
The construction of a dam influences downstream channel stability in two ways.
水坝的建设在两个方面影响下游河道的稳定。
15.
The Research on Karst Formation of Yangqu Dam Site in the upper Reaches of the Yellow River;
黄河上游河源区羊曲坝址岩溶形成机理研究
16.
Study on Seepage Control Method for the Upstream and Downstream Sides of RCCD;
碾压混凝土坝上下游防渗结构型式研究
17.
Main Source of Nitrate and Phosphate Pollutant in Muyang River of Songhuaba Reservoir
松华坝水库上游牧羊河氮、磷主要来源研究
18.
Analogue Simulation for Crown Cantilever of Masonry Arch Dam
砌石拱坝上游拱冠梁底部拉应力仿真分析