1.
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工
2.
Technology Research for Steel Box Girder Fabrication and Preassembly of E Dong Yangtze River Bridge
鄂东大桥钢箱梁梁段制造及预拼装技术研究
3.
Mechanical Effects on Bridge Structure Induced by Noise Barrier Should Be Considered
桥梁段声屏障设计应考虑其对桥梁的力学影响
4.
FINITE ELEMENT ANALYSIS OF BEAM-TO-COLUMN CONNECTION WITH CANTILEVER BEAM BOLTED-SPLICING
带悬臂梁段拼接的梁柱连接有限元分析
5.
Section model test method for steel truss girder segment in the along Beijing-Shanghai
京沪高速大胜关桥钢桁梁段节段模型试验方法
6.
The flood swept away part of the bridge.
洪水冲走了一段桥梁。
7.
The Research on Construction Control in the Incremental Launching of Main Girder of Cable-stayed Bridge with Steel Box Girder
钢箱梁斜拉桥主梁顶推法施工阶段控制研究
8.
Mechanical Analysis for Prefabrication Stage of Prestressed Concrete T Beams on Bridge
桥梁中预应力混凝土T形梁预制阶段力学分析
9.
Construction Technology for Beams of Steel Box Girder and Site Assembly of the Closure Segment
钢箱梁横梁及合龙段现场拼装施工技术
10.
The Behaviour of Restrained Steel Beam during Heating and Cooling and the Damage of Beam-to-Column Connection;
约束钢梁在升温段和降温段的反应及梁柱节点的破坏研究
11.
Each succeeding fabricated box is erected on trolleys.
每段预拼的箱梁安装在小平车上。
12.
The force of expansion makes it necessary to build a bridge in sections.
因为膨胀力的缘故,桥梁必须分段制造。
13.
Insert lower half of bushing into square hole in crossmember.
将衬套下半段放入横梁的方孔。
14.
Look at the river and see if there is a better place to build the bridge.
查看是否有更适合建造桥梁的河段。
15.
The cross girder center segments of the bents were field bolted.
构架横梁的中间段在工地用螺栓连接。
16.
The Construction Craft at 0 #~1 # Node Section of Box Continuous Beam
箱形连续梁0~1~#节段施工工艺
17.
Research on Stiffness Matching of the Joint of Composite Cable-stayed Bridge;
混合梁斜拉桥结合段刚度匹配的研究
18.
Stress Analysis of T-shaped Beam during the Procession of Tensioning Tendons;
张拉预应力筋阶段的T型梁应力分析