1.
Design of Diversion Piers and Division Pier in Chaodongweigang Water Conservancy Project
朝东圩港闸站枢纽导流墩及中隔墩设计
2.
Structure Stress Analysis and Optimization for the Naji Junction Shiplock
那吉航运枢纽船闸闸室结构应力分析与优化
3.
Study on Construction-Schedule Early-Warning Model of Waterlocks Key Project;
水闸枢纽工程施工进度预警模型研究
4.
Study on Fault Diagnosis Technology for Floodgates Maintenance Automation of Hydro Project;
水利枢纽闸门维护自动化-故障诊断技术研究
5.
Research and Application of Floodgates Integrated Automation System for Hydro Project;
水利枢纽闸门综合集成自动化研究与实践
6.
Study of Pressure Control Methods Through Impounding Water for the Gates of the Xiaolangdi Reservoir;
小浪底水利枢纽水工闸门充水平压方式研究
7.
The Risk Assessment and Handling of Construction-Schedule in Waterlocks Key Project;
水闸枢纽工程施工进度风险评估与应对
8.
Contract Variation and Claim Management of Zhuzhou Navigation-Power Junction s Lock Project;
株洲航电枢纽船闸工程合同变更与索赔管理
9.
On Gate Hoist Girder Construction Stent Design of Jinyintai Navigation and Hydropower Project
金银台航电枢纽闸门启闭机主梁施工支架设计
10.
Operation scheme for Yingpan hydro-junction's water-saving lock in Wujiang River
乌江银盘水利枢纽省水船闸运行方式研究
11.
Finite Element Analysis of Stoplog of Navigation Lock No.2 for Gezhouba Hydraulic Project
葛洲坝水利枢纽二号船闸叠梁门有限元分析
12.
An Experimental Study of the Hydraulic Models of the Sluice in Nanxi River Water Supply Projects
楠溪江供水工程拦河闸枢纽水工模型试验研究
13.
Anti-icing method of ship lock gate for Songhuajiang Dadingzishan Navigation-Power Junction
松花江大顶子山航电枢纽船闸闸门防冰措施试验研究
14.
Research on the Deep Excavation Effect of the Interchanging Metro Station;
地铁换乘枢纽后建车站施工影响研究
15.
Modeling and Simulation of Microscopic Pedestrian Flow in Subway Station Hubs;
地铁枢纽站微观客流集散模型及仿真
16.
Study on Space Order of City Railway Hub for Passenger Transportation;
城市铁路客运枢纽站前空间秩序研究
17.
Study on the Optimal Design of the Hydro-junction of Pailou Tubular Turbine Hydropower Station;
牌楼贯流式水电站枢纽设计优化研究
18.
Evaluation of the Competitive Capability on External Market of Hub Station;
铁路客运枢纽站外部市场竞争力评价