1.
The Influence of the Loop of Shearing Soil to the Seepage Field Suction Anchor during Suction Penetration;
剪土环对吸力锚负压沉贯下沉过程中渗流场的影响
2.
Numerical Analysis of Soil Plug Inside Suction Anchor During Suction Penetration;
吸力锚负压沉贯下沉过程中土塞生成的数值分析
3.
Transient-dynamic-FEM Analysis of the Course of Vibration-driving the Thin-wall Large-diameter Cylinder Structure;
大直径薄壁圆筒结构振动下沉过程瞬态动力有限元分析
4.
The sediment which settles down in the purifying process is used as fertilizer.
净化过程中沉淀下来的沉积物可以用作肥料。
5.
Model for dynamic process of ground surface subsidence due to underground mining
地下采矿引起的地表下沉的动态过程模型
6.
Experimental investigation on motion responses of immersing tunnel element under wave actions
波浪作用下沉管管段沉放过程运动响应的试验研究
7.
Frequency responses of immersing tunnel element under wave actions
波浪作用下沉管隧道管段沉放过程的频域响应(英文)
8.
Sedimentary Characteristics and Subglacial Processes of the Glacial Deposits in Hailuogou Glacier,Gongga Mountain
贡嘎山海螺沟冰川沉积特征与冰下过程研究
9.
On the construction of double-wall steel cofferdam of Pier 11 of Wuhu Yongtze River Bridge;
双壁钢围堰吸泥下沉、清基及水下封底过程中有关问题的处理办法
10.
The copper sulfate reacts with the elemental iron to form ferrosulfate, and the copper is reduced to the elemental form, which precipitates out in a settling trench. The process is summarized in the following reaction:
铜被还原成单质形式,沉积于沉积池中,这个过程可用下面的方程式表示:
11.
forming or depositing in layers.
层的形成或沉淀过程。
12.
the process of forming a chemical precipitate.
形成化学沉淀物的过程。
13.
deposition from one deposit to another.
从一种沉积物到另一种沉积物的沉积过程。
14.
A short ridge or mound of sand and gravel deposited during the melting of glacial ice.
冰砾阜,冰碛阜冰川冰融化过程中沉积下来的低矮的沙石堆
15.
No, human bodies sink until the gases created by the internal putrefaction have had time to accumulate.
除非人体内部腐败过程有足够时间累积气体,不然尸体会下沉的。
16.
Abstract: The reasons of the decrease of flocculating sedimentation of activated sludge in the process of bio chemical sewage treatment were analyzed.
文摘:分析了在污水生化处理过程中活性污泥沉降性能下降的原因。
17.
Dynamics and Critical Load of Sulfur and Nitrogen under Acid Deposition in Shaoshan Forest;
酸沉降影响下韶山森林硫与氮的动态过程及临界负荷研究
18.
open caisson method in underground construction
地下工程沉井法施工