1.
Practice On Foundation Pile Rock Blasting of Huaihai Campaign Museum
淮海战役纪念馆基础桩井岩石爆破实践
2.
Experimental study on mechanical properties of single-pile platform with three wells in one slot
单筒三井独桩简易平台桩腿力学性能试验研究
3.
Study on the Mechanism of Joint Load-bearing of Various Sections in a Mine Shaft Tower System;
井塔—桩筏基础—地基—井壁的共同作用机理研究
4.
Application of Deep Well Pump Well-points Dewatering in Treatment of Defective Pile Foundation
深井泵井点降水在处理缺陷桩基中的应用
5.
Vertical pipe shield and underwater pile-foundation protection frame for wellhead
垂直护管水下桩基式井口保护架结构
6.
Wave Equation Analysis and Design Method of Driven Pile for BOHAI Drilling Platform Engineering;
渤海钻井平台桩基工程打入桩波动分析及其设计方法
7.
Reservoir Modeling and Remaining Oil Research of Zhung39 Block in Wuhaozhuang Oilfield;
五号桩油田桩39井区油藏地质建模与剩余油分布研究
8.
Study on Mechanism for Spudcan during Preloading and Extracting of Offshore Jack-up Drilling Platform and Bearing Capacity of Improved Spudcan in Static and Cycling Loads
海上自升式钻井平台插/拔桩机理及新型桩靴静/动承载力研究
9.
Taking about the Top-down Construction Method of Sidewall Support with Concrete Piling in Rotational Flow Well of Steelmaking and Continuous Casting
炼钢连铸旋流井混凝土排桩支护井壁逆作法施工技术的应用
10.
Study on Calculation Method for Surface Curves Above Single Row Permeable Pile Groin
单排井柱桩透水丁坝上游水面线计算研究
11.
Seismic Attribute Optimized Technique Applied to Zhuang 106 Area Sedimentary Facies Research
应用地震属性优化技术研究桩106井区沉积相
12.
The application of micro steel tube grouting pile in large-scale shaft construction
微型钢管压浆桩在大型竖井施工中的应用
13.
Releasing Stress by Sand Well Pipes during Construction of Congested Pile Foundation
在密集桩基施工中应用砂井插管释放应力
14.
Construction Techniques for the Pile Foundation of the Longjing Bridge in Karst Area
龙井大桥喀斯特岩溶地质桩基施工技术
15.
Water Diversion and Retarding Action Effect of Single Permeable Pile Groins
单排井柱桩透水丁坝的分水缓流作用效果
16.
Application of Composite Pile with Caliber Bore-hole in Landslide Emergency Rescue
钻孔组合桩在某石油井场滑坡体抢险中的应用
17.
A DISCOVERY OF EOCENE SIPHONOALGOCLASTIC DOLOMITE FROM WELL ZHUANG 65,GUBEI,SHANDONG PROVINCE,AND ITS SIGNIFICANCE IN OIL EXPLORATION
桩65井始新世管状藻屑白云岩的发现及其石油勘探意义
18.
Influence of Pile Shoe Pulling Out on Fundation of Bucket Foundation Platform;
钻井船桩靴的拔出对筒型基础平台地基的影响分析