1.
The Application of Moden Statistical Method in Research of Construction Eengineering Cost Variation;
现代统计方法在建设工程造价变更研究中的应用
2.
The Confirmation and Control of Construction Cost in Project Change;
论工程变更后工程造价的确定与控制
3.
Analysis of Influences of Project Change over Municipal Engineering Cost;
工程变更对市政工程造价的影响分析
4.
On costs identification and checking of engineering changes under list valuation
清单计价模式下工程变更的造价确定与审查
5.
Influence of Variation Order during the Construction Stage on Construction Cost;
施工阶段工程变更签证对工程造价的影响
6.
Engineering Change and Cost Control during Construction of Highway Engineering Project;
公路项目施工阶段工程变更及其造价控制
7.
How to deal with the accounts settling of engineering changed items by chartered estimation engineers;
造价工程师如何处理工程变更中的结算问题
8.
The policy of cost control from the owner s view under the project changes;
工程变更条件下的甲方工程造价控制策略
9.
Brief Talk about Influence of Project Change in Road Construction on Cost Control;
浅谈道路建设中工程变更对造价控制的影响
10.
The Research of the Modification Control Technology in the Cost Management of Integrated Investment and Time Limit
工期与投资集成造价管理的变更控制技术研究
11.
Cost Control of Design Change in Highway Tunnel Engineering
公路隧道工程设计变更中的工程造价控制
12.
to Strengthen the Management of Design Alteration and Project Licence and Control the Cost of the Project;
加强设计变更及工程签证管理严格控制工程造价
13.
and more creative changes.
更富有创造性的改变。
14.
The prices for food are subject to variation.
食品的价格可能变更。
15.
These prices are subject to variation.
上列价格可能变更。
16.
As capital flooded in, these borrowings soared, as did property values and share prices.
而资本的涌入造成了固定资产价值和股票价格的一路飙升,贷款的行为就会变得更加疯狂。
17.
variable overhead price variance
变动制造费用价格差异
18.
Yet the main focus is still on better and more expensive Rieslings, for which there is strong demand, particularly in America.
不过,造酒商们还是把重心放在酿造品质更好,价格更高的雷司令上。