1.
Study on the Sluice Computer Aided Design and Seepage Flow under Sluice Foundation;
水闸计算机辅助设计及闸基渗流研究
2.
Selection of Reinforcement Scheme against Tensile Stress at Gate Basement of Wulin Water Gate
武林水闸消除闸基底拉应力的加固方案选择
3.
The foundation of gated-weir of the Wanbahe Power Station is located on Quaternary deposit which is soft.
湾坝河水电站闸基坐落在第四纪砂砾石覆盖层上,属于软基上建闸。
4.
Study and Development on the Sluice Chamber CAD System Based on ObjectARX;
基于objectARX的水闸闸室CAD系统研究与开发
5.
basic gate propagation delay time
基本闸传递延迟时间
6.
The Numerical Analysis of Mechanical Behavior of Sluice Structure and Foundation;
水闸闸室结构与地基力学作用机理数值分析
7.
The Study on Technology of Treatment of Foundation of Sluice Project in Wenzhou;
温州地区水闸工程地基处理技术研究
8.
Research on Visualization Analysis System for Sluice Based on ANSYS;
基于ANSYS的水闸可视化分析系统研究
9.
The Long-range Monitor System for a Strobe Based on CAN Bus;
基于CAN总线的远程闸门监控系统
10.
The Study on Monitoring System of Sluice Gate Based on PLC;
基于PLC的水电站闸门监控系统的研究
11.
Optimization of High Voltage Vacuum Switch s Switching Parameter Based on ADAMS;
基于ADAMS的高压真空开关合闸参数优化
12.
The Simulation of Fault-synchronizing Based on Matlab;
基于MATLAB的误同期合闸仿真
13.
On Development of the-same-term Switch Equipment Based on 89C51;
基于89C51的发电厂同期合闸装置研制
14.
Study on Electro-thermal Model of Thyristor in PSpice
基于PSpice的晶闸管电热模型研究
15.
Single-phase adaptive reclosing based on phase angle of fault
基于故障相相角的单相自适应重合闸
16.
Aseismic Performance Analysis of a Certain Sluice Based on SAP2000
基于SAP2000的某水闸抗震性能分析
17.
SIMULATION OF SUPPORT-HORIZONTAL STEEL GATE BASE ON ANSYS
基于ANSYS的撑卧式钢闸门模拟研究
18.
Thyristor Inverter Circuit Simulation Test Based on Multisim 8.0
基于Multisim 8.0的晶闸管变流电路仿真试验