说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 汛期日调节
1.
The Research on Influence of Peaking Operation of TGP Hydropower Station in Flood Period on the Upstream Navigation Conditions;
三峡工程电站汛期日调节对上游通航水流条件的影响研究
2.
The Application of Staged Limited Level of Reservoir during Flood Season and Seasonal Flood Periods Classification in the Dongfeng Reservoir;
水库汛期分期及汛限水位调整在东风水库中的应用
3.
Analysis on Channel Scour and Fill Regulation in Normal Water Period of Flood Season of the Lower Yellow River
黄河下游汛期平水期河槽冲淤调整分析
4.
Daily Runoff and Suspended Sediment Concentration Forecast for Flood Season of Tao River Basin;
洮河流域汛期日径流与含沙量过程预报
5.
Dispatch of Rain and Salt Drainage of Landscape Water of A Northern Coastal City in Flood Season
北方某滨海城市景观水体汛期防洪排咸调度
6.
Research on Water Quality Objective Combined Optimal Dispatching of Three Gorges Reservoir in Non-flood Season
耦合水质目标的三峡水库非汛期优化调度研究
7.
Study on Operation Optimization in Pre-flood Falling Stage of the Three Gorges Reservoir
三峡水库汛前消落期优化调度方式研究
8.
ANALYSIS OF THE DEFINITION OF THE ONSET AND ENDING DATES OF THE ANNUALLY FIRST RAINY SEASON IN SOUTH CHINA AND ITS INTERANNUAL VARIATION CHARACTERISTICS
华南前汛期起止日期的确定及降水年际变化特征分析
9.
Factor Analysis for Ice Flood and Model Research for Freeze-up Time and Break-up Time in the Inner Mongolia Reach of the Yellow River;
黄河内蒙段凌汛成因分析及封开河日期预报模型研究
10.
Impact of daily regulation for hydropower station on navigation conditions of downstream side of Gezhouba project in dry season
电站日调节波对葛洲坝下游枯期通航条件影响
11.
Reinforcement of Cetian Reservoir construction in the flood season and flood regulation
册田水库除险加固工程汛期施工与洪水调度浅析
12.
Application of Neural Networks to Determine Limited Water Level of Reservoir Flood Routing
确定水库分期汛限水位的神经网络调洪演算方法
13.
Flood Season Division and Reansonable-Determination of Limited Water Level of Cascade Resevoirs;
梯级水库汛期分期及汛限水位合理确定研究
14.
Fuzzy Division of Flood Season and the Determination of Its Flood Control Water Level of Reservoir
水库汛期模糊划分及其分期汛限水位的确定
15.
Fuzzy Partition of Flood Season and Determination of Limited Water Level on Zhangze Reservoir;
漳泽水库汛期模糊划分及汛限水位的确定
16.
Decision-making on reservoir flood control level and its control manner in post-flooding seasons for Biliuhe Reservoir
碧流河水库后汛期汛限水位及控制运用方式
17.
Easter has no fixed date.
复活节无固定日期,
18.
except (for) Sundays and holidays
星期天与节假日除外