1.
Structural design points for long ring steel box girder bridge
超长环形连续钢箱梁天桥结构设计要点
2.
Investigation of Shear Lag Effect of Continuous Steel Box Girder Bridge with Great Width-to-Span Ratio
大宽跨比连续钢箱梁桥的剪力滞效应研究
3.
In this article, the author states the multi-points automatic continuous jacking construction technology of a continuous steel box beam over several railway lines and electrified contacting nets.
介绍了跨越多条铁路线路及电气化接触网的连续钢箱梁多点自动连续顶推施工技术。
4.
Research on Designing Scheme for V-shaped Continuous Steel Box Girder Bridge in High-speed Railway;
高速铁路V形钢箱连续梁桥设计研究
5.
Research on the Tensioning Sequence of the Steel Wires of P.C. Continuous Curved Box Girder;
连续弯箱梁桥预应力钢束张拉次序研究
6.
On Swing Construction of Steel Structure Continuous Box Girder Bridge Crossing Jingguang Railway,Shijiazhuang
石家庄跨京广铁路钢结构连续箱梁桥转体施工
7.
The steel pipe supporting and bamboo slab rubber bottom dieing construction in fish bellied continuous box beam bridge
鱼腹式连续箱梁桥的钢管支架竹胶板底模施工
8.
Steel box continuous curved beam with its big span, little section, esthetical sculpt, is adopted generally by municipal projects.
钢箱连续曲梁以其跨度大、面小、型美,普遍被市政工程采用。
9.
Research on Prestressing Effect of Externally Prestressed Steelbox-concrete Composite Continuous Beam Bridge;
体外预应力钢箱—砼结合连续梁桥预应力效果研究
10.
Structure Design and Finite Element Analysis of the Prestressed Continuous Concrete Box-Girder with Corrugated Steel Webs;
波形钢腹板PC组合连续箱梁桥的结构设计与有限元分析
11.
The Design、Construction and Finite Element Simulation of Reinforcement Concrete Continuous Box Beam;
钢筋混凝土连续箱梁结构设计、有限元模拟及其施工控制
12.
Research on Dynamic Characteristic and Seismic Response of the Prestressed Continous Concrete Box-girder Bridge with Corrugated Steel Webs;
波纹钢腹板PC组合连续箱梁桥动力特性与地震反应研究
13.
Construction Process and Prestressing Parameter Analysis of the Prestressed Concrete Composite Continuous Box-Girder Bridge with Corrugated Steel Webs
波形钢腹板PC组合连续箱梁桥施工过程与预应力参数分析
14.
Construction Method of Steel Pipe Scaffold Bamboo Formwork for Fish-bellied Continuous Box Girder Bridges in City
城市鱼腹式连续箱梁桥采用钢管支架竹胶板底模的施工方法
15.
Probe into Construction Technology of Cast-in-place Reinforced Concrete Serial Box Girder in Expressway Viaduct
高速公路高架桥钢筋混凝土现浇连续箱梁施工技术探讨
16.
Study of indexes of continuous girders (double track line) erected with cast-in-place cantilever method;
悬浇连续箱梁(双线)梁部指标的研究
17.
Research on Performance of Shear Connectors on the PC Box-girder Bridge with Corrugated Steel Webs
波形钢腹板PC箱梁桥剪力连接件研究
18.
Study on Square Box Bolt Welding Girder Steel Bridger Interface Friction-increasingcoat;
方箱式栓焊梁钢桥梁连接面增摩涂层的研究