1.
The underwater grouting and plugging consolidation disposal measures on drainage pipe culverts in Dashahe Reservoir;
放水涵管水中灌浆封堵加固处理方法
2.
The fence was strengthened with wire.
这堵围栏用金属丝加固了。
3.
A consolidating technology of pouring starch into bottom board to cut off water in coal pitJiaozuo coal industry group Fang-Zhuang coal mine;
井下煤层隔水底板注浆堵水加固技术
4.
Application of the grouting and reinforce technology for stopping water on tunnel through the large fault
巷道过断层注浆加固堵水技术的应用
5.
Study on Test and Application of the Watertight and Reinforcing Grout in Coal and Rock Mass
煤岩体防渗堵水加固浆液试验及应用研究
6.
Clinical Effect Comparison of Angio-Seal Vascular Closure Device and Manual Compression
冠脉诊疗后Angio-Seal血管封堵器和徒手加压止血的比较
7.
Design and Study on Figure and Structure of Hydraulic Tunnel Plug
水工隧洞封堵堵头体型结构设计研究
8.
block access [web site]
堵截、封锁、阻止接达〔网址〕
9.
China-made occluder in treatment of 106 patients with congenital heart disease
国产封堵器封堵治疗先天性心脏病106例
10.
With 1-5% TPA LZ 1 added the solid particle size distribution of the fluid is not changed.
加量1%~ 5 %的暂堵剂不影响钻井液中固相粒度分布。
11.
Full-face Advance Grouting for Water Sealing and Reinforcement of Karst Section of Xiangshan Tunnel
象山隧道岩溶地段全断面超前注浆堵水与加固技术
12.
The application of grouting for blocking water and rock reinforcement technology in Jicha expressway BuYu tunnel
湖南吉茶高速公路补育隧道注浆加固堵水施工技术
13.
Core flow experiment showed that plugging rate of lost circulation material was over 97 % .
人造岩芯封堵实验表明,该堵漏剂封堵率达97%以上;
14.
Waterproof and Shutoff for Closing of Pressured Dewatering Well Located in Foundation Pit
基坑内承压降水井封井的防水与封堵
15.
bridging solid shape
暂堵剂固体颗粒形状
16.
The wall is of very solid construction, ie is solidly constructed.
这堵墙构 得非常坚固.
17.
The software and hardware design of remotely controlled sealing and unsealing of plugging module
封堵模块遥控密封和解封的软硬件设计研究
18.
HIGH-PRESSURE GUNITE TECHNIQUE FOR DRAINPIPES SEALING
用高喷灌浆技术围封加固压力排水管道