说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 建设项目法人责任制
1.
Considerations of innovating legal person responsible system of water project construction;
创新和完善水利建设项目法人责任制的思考
2.
Probe into the Essentials of Project Legal Person's Responsibility System in Refinery&Chemical Plant Construction
炼油化工建设项目法人责任制要点分析
3.
Many projects lack a sound system of authorized legal person responsibility, and have obscure construction responsibility and rights;
有些工程项目项目法人责任制不健全、不到位,建设项目责任不清,职权不明;
4.
The system of holding the legal person responsible for projects
健全项目法人责任制
5.
To clearly divide the boundary of construction and management and to realize the project legal person responsible system.
二是进一步理顺工程建设管理关系,实行规范化的项目法人责任制。
6.
system of investment responsibility for capital construction project
基本建设项目投资包干责任制
7.
Explorative Analysis on Project Legal Person Responsibility System for Public Water Conservancy Project;
公益性水利项目实行项目法人责任制探讨
8.
The statutory liability of engineering construction supervision in project construction;
工程建设监理在项目建设中的法律责任
9.
The study of Project Financing and Decision-making in Project Corporation Liability System between Chinese and Japan;
中日项目法人责任制融资决策监管对比研究
10.
Discussion on Project Legal Person s Investment Control in the Project Construction Management;
浅谈项目法人在项目建设管理中的投资控制
11.
The Establishment of Building Group Based on Responsibility of Project Manager;
基于项目经理负责制的建筑团队建设
12.
Research on Liability Insurance for Design in Public Construction Projects;
公共建设项目工程设计责任险问题研究
13.
The Research into the System of Construction Project Legal Person Taking Responsibility in the Social Benefit-based Water Projects;
公益性水利工程实行项目法人责任制的相关问题研究
14.
Thinking on How to Deepen the Business Corporation Responsibility System in Engineering Project Invested by Government;
对如何深化政府投资工程项目法人责任制的思考
15.
One-Line-and-Two-Aspect: Primary Thoughts on perfecting the System of Project Legal Person Taking Responsibility in the Social Benefit-based Water Projects;
一线二面——完善公益性水利工程项目法人责任制的初步构想
16.
Empirical Study of the Construction of Competency Model of Persons in Charge of Scientific Research Project;
科研项目负责人胜任力模型构建的实证研究
17.
For every job or construction project it is necessary to specify the work to be done, the personnel required to do it, work quotas, standards of quality, and a time schedule.
任何一项任务、一个建设项目,都要实行定任务、定人员、定数量、定质量、定时间等几定制度。
18.
Implement of Scientific Management to Optimize Engineering Project Responsibility System;
实行科学管理切实作好工程项目建设负责制