说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地下连续墙结构
1.
MODIFICATION OF CONTINUOUS CONCRETE WALL STRUCTURE BOTTON SEALING SCHEME ON SCALE PIT OF TIANJIN GENERAL SEAMLESS TUBE PLANT TUBE MILL
对天津无缝钢管总厂轧管车间铁皮坑地下连续墙结构封底方案的修改
2.
Construction Technology of Special-shaped Diaphragm Wall in a Subway Station
地铁车站围护结构异形地下连续墙施工技术
3.
Stability Analysis and Safety Monitoring on Anchor Foundations of Underground Diaphragm Wall Structure;
地下连续墙围护结构锚碇基础稳定与安全监测
4.
Analysis on Driven Coefficient of Minor Rounded Continuous Concrete Wall Structure
小直径圆形地下连续墙围护结构入土系数分析
5.
THE HORIZONTAL DISPLACEMENT OF UNDERGROUND CIRCULAR CONTINUOUS WALL STRUCTURE
地下圆形连续墙支护结构的水平位移公式
6.
Integration Construction of a Pile,Wall-Style of Underground Continuous Wall
桩、墙结合式地下连续墙施工技术研究
7.
Leakage treatment of underground continuous wall of Shanghai World Financial Center's annex
上海环球金融中心裙房地下结构地下连续墙渗漏修复
8.
Substructure method for dynamic response analysis of site with circular diaphragm wall
圆形地下连续墙场地动力反应分析的子结构方法
9.
Analysis and Deformation Monitoring in Diaphragm Wall Construction
地下连续墙施工变形监测与结果分析
10.
Study on Soil-structure Interaction of the Diaphragm Sheet-pile Wharf with Separated Relieving Platform;
分离卸荷式地下连续墙板桩码头结构与土相互作用研究
11.
Excavation of Underground Continuous Wall Retaining Structure of Rock Encountered Breeze Optimization of Construction Technology Research and Application
基坑围护结构地下连续墙遇微风化岩施工技术优化研究及应用
12.
Study on Control of Tunnel Central Line of Shield Tunnel Passing alongside Underground Diaphragm Wall in Soft Soil Stratum
盾构隧道侧穿地下连续墙的轴线控制研究
13.
Summarization of structure design and construction of prestressed concrete under ground continuous wall rectangular pumping house are introduced in this paper.
结合工程实例,对预应力地下连续墙矩形泵房的结构设计、工实践进行了总结。
14.
Study on Construction Technology of "Three Walls Unified into One" for Underground Diaphragm Wall
地下连续墙“三墙合一”的施工技术研究
15.
The underground continuous wall special sector guide wall construction of some subway station
某地铁车站地下连续墙特殊地段导墙的施工
16.
Study on Durability of Diaphragm Wall of Subway Station;
地铁车站地下连续墙耐久性规律研究
17.
MONITORING ON PERFORMANCE OF DIAPHRAGM WALL DUE TO DEEP EXCAVATION OF SUBWAY STATION
地铁车站深基坑地下连续墙变形监测
18.
Construction Technology of "Two Walls Combined into One" Diaphragm Wall for Deep Foundation Pit in Subway Station
地铁车站地下连续墙“二墙合一”深基坑施工技术