1.
Construction cost management of construction enterprise after implement of engineering quantity list pricing;
谈工程量清单计价实施后施工企业的造价管理
2.
The management and development of construction enterprises after ISO9000 certification;
ISO9000认证后施工企业的管理与发展
3.
Implementation: Construction, Planting. Maintenance. Post-construction Evaluation.
实施: 施工、,绿化、养护 和完工后的评价
4.
Then we'll start construction.
然后我们就开始施工了。
5.
Constructional problems in back gated area and countermeasures for them
浅谈后浇带施工质量问题及预控措施
6.
The Project Management on the 3th Biding of the Last Part Station Construction of Jin-Jun Railway;
金筠铁路站后工程第Ⅲ标段施工管理
7.
After the pouring of the reinforced concrete structure construction ribbon common quality problems and preventive measures
后浇带施工常见的质量问题及预防措施
8.
The measures of concrete late poured band and expansive reinforce tape in construction
混凝土后浇带及膨胀加强带在施工中的措施
9.
Assist center director in completing the report upon finishing construction with the construction company.
在施工完毕后协同学校负责人和施工方共同完成竣工验收报告。
10.
The bad weather will set back our building plans.
恶劣的天气将使我们的施工计划延后。
11.
Post Grouting Construction Technique for Bored Piles with Slurry-supported Wall
泥浆护壁钻孔灌注桩后压浆施工技术
12.
Construction Method of Replacing the Upper Section of Concrete Poles after Stringing
架线后更换混凝土杆上段的施工方法
13.
Research on the Deep Excavation Effect of the Interchanging Metro Station;
地铁换乘枢纽后建车站施工影响研究
14.
Thinking on Implementation of ‘National Natural Forest Protection Project’in Mile County;
弥勒县“天保”工程启动实施后的思考
15.
Design and construction of late poured band of the super long concrete structure
超长混凝土结构后浇带的设计与施工
16.
Post-tensioning Producing Method of the Prefabrication of 40 m Prestress Box
后张法40m预应力箱梁预制施工技术
17.
Analysis on the Anti-seepage Measures in the Danger Removal and Dam Reinforcement Project of Houwan Reservoir
后湾水库除险加固工程防渗措施简析
18.
Discussion About The Effect After The Implement Of Changing Farmland Into Forest
对实施退耕还林工程后续效果的初探