说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 混凝土后浇带
1.
The measures of concrete late poured band and expansive reinforce tape in construction
混凝土后浇带及膨胀加强带在施工中的措施
2.
Discussion on concrete late poured band design and construction of building construction engineering
房屋建筑工程混凝土后浇带的设计与施工初探
3.
Research on the Minimum and Invalidated Ratio of Reinforcing Steel Bars Across the Post-Casting Band in Concrete Structures
对导致混凝土后浇带失效的横穿钢筋最小配筋率的研究
4.
Application of After-irrigation-strip Design and Construction in Super-long Cast-in-place Concrete Structure
后浇带在现浇混凝土超长结构中的应用
5.
Study on Dismantling Mold Base of Post-Pouring Band in Cast-in-place Reinforced Concrete Structure
浅探现浇钢筋混凝土结构后浇带模架的拆除
6.
Design and construction of late poured band of the super long concrete structure
超长混凝土结构后浇带的设计与施工
7.
On constructional method of replacing after pouring area with expansion to strengthen area of concrete
浅谈混凝土膨胀加强带代替后浇带的施工方法
8.
The Setting of Embedded Joint for High-rise Concrete Building with Podium
简述带裙房高层混凝土建筑后浇带的设置
9.
Study on Application of the Late Poured Band in Large Scale Plate-type Concrete Structures;
后浇带在大尺度板式混凝土结构中的应用研究
10.
The Stress Analysis and the Application to the Massive Concrete of the Later Joint-Filled Slots;
后浇带的应力分析及在大体积混凝土中的应用
11.
Use of Embedded Joint in Mass Concrete Tank
后浇带施工技术在大体积混凝土水池中的应用
12.
EXPERIMENTAL STUDY OF CONCRETE COMPOSITE SLABS MADE OF CERAMISITE CONCRETE POST-POURED ON PRE-CAST ORDINARY CONCRETE
普通混凝土后浇陶粒混凝土迭合板的试验
13.
Brief analysis of influence of post-poured strips on thermal stresses in concrete main power building for 600MW unit
后浇带对600MW机组混凝土主厂房温度应力影响浅析
14.
The concrete pump is only relocated after a number of sections have been completed.
浇注完数段路面板后,才移动混凝土泵。
15.
Study of Seismic Behavior for R.C Frame Post-cast Joint;
混凝土后浇框架节点的抗震性能研究
16.
APPLICATION OF COLD ROLLED DEFORMED BAR IN CONCRETE SLABS
冷轧带肋钢筋在现浇混凝土板中的应用
17.
feeding control case for depositing and mixing of concrete
混凝土浇灌给料控制箱
18.
concrete placement systems & equipment
混凝土浇灌系统与设备