说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水电站水库优化调度
1.
Optimization of reservoirs dispatching of Huaguangtan cascade power stations
华光潭梯级水电站水库优化调度探讨
2.
Research on Dispatching Optimization of Hydropower Station Reservoir Based on Time-varying Electricity Price;
基于分时电价的水电站水库优化调度研究
3.
Particle Swarm Optimization and Its Application in Cascade Hydropower Stations Scheduling;
粒子群优化方法在梯级水电站水库优化调度中的应用研究
4.
Orthogonal immune clone particle swarm optimization algorithm and its application in hydropower station reservoir optimal operation
基于量化正交免疫克隆粒子群算法的水电站水库优化调度研究
5.
Study on Optimum Operation Based on Organizational Evolutionary Particle Swarm Algorithm for Hydropower Station Reservoir
基于组织进化粒子群算法的水电站水库优化调度研究
6.
Study on the Optimal Operation Model of Hydropower Station Reservoir and the Application of GFS Information;
水电站水库优化调度模型及GFS预报信息的应用研究
7.
Research on the Optimal Operation of Cascade Hydropower Station Reservoirs Based on Immune Particle Swarm Optimization Algorithm;
基于免疫微粒群算法的梯级水电站水库优化调度研究
8.
Optimization of hydropower station operation by using particle swarm algorithm based on simulated annealing
基于模拟退火的粒子群算法在水电站水库优化调度中的应用
9.
Study on the Reservoir Operation Chart of Hydropower Station and Short-term Optimal Operation;
水电站水库调度图及短期优化调度研究
10.
Study on Optimal Regulation of Hydropower Station Reservoir System with Transbasin Water Diversion;
跨流域引水水电站水库系统优化调度研究
11.
Hydropower Reservoir Flood Optimal Scheduling Model Pragmatic Approach;
水电站水库防洪优化调度的模型与方法
12.
Study on the runoff description and optimal operation models for Ertan hydropower station
二滩水电站水库径流描述与优化调度模型研究
13.
Optimization of Hydropower Scheduling on Small and Medium Reservoirs;
中小型电站水库日常发电调度的优化研究
14.
Study on Short-term Operation Scheduling of "One-reservoir and Multi-cascade" Hydroelectric Stations;
“一库多级”式梯级水电站群短期优化调度研究
15.
Application of Comprehensive Water Consumption Rate to Reservoir Operation Optimization of Hydropower Station
水电站综合耗水率参数在水库优化调度中的应用
16.
Study on Short-Term Generate Electricity Optimal Dispatching System of Wujiang River Cascaded Hydropower Stations and Reservoirs;
乌江梯级水电站水库群短期发电优化调度系统研究
17.
An improved discriminant criterion method (IDCM) derived form the discriminant criterion method is presented to solve long-term optimal scheduling operation problem of large-scale mixed hydropower systems.
采用改进判别式法求解大规模混联水电站库群发电优化调度问题。
18.
Research on Short-Term Generation Scheduling of Hydro-power System and Optimal Dispatch Software System;
水电站短期优化调度及优化调度系统软件研究