1.
Study on Forecasting Model of Hourly Water Consumption for Optimal Operation;
调度时用水量预测的系统理论方法及应用研究
2.
Water Optimal Regulation for Eastern Route of South-to-North Water Diversion Based on TOU Power Price
基于分时电价的南水北调东线水量优化调度
3.
Research on Water Regulation Model of Tarim River and Its Application;
塔里木河流域水量统一调度模型研究及应用
4.
Cooking time can be used as a guide to the degree of doneness, but cooking time is affected by fat and moisture content and shape or size of the cut.
烹调的时间也可用来指示烹调的程度,但烹调时间还受脂肪和含水量及肉块的形状和大小所影响。
5.
The Water Operation Research for Middle-Route of South-to-North Water Transfer Project;
南水北调中线工程水量调度仿真研究
6.
Study of Numeric Simulativa Model of Groundwater in Heihe River Basin and Its Implementation in Water Scheduling Management;
黑河流域地下水数值模拟模型及在水量调度管理中的应用研究
7.
Study on Water Storage of Beidagang Reservoir and Real-time Flood Dispatch;
北大港水库蓄水及洪水实时调度研究
8.
Union dispatch model for water quality and quantity in the middle reaches in Huaihe river
淮河中游水量水质联合调度模型研究
9.
By maintaining workability, but at a lower water content, concrete strength may be increased without the need for further cement addition.
保持工作度不变,在低用水量时,不必增加水泥用量,混凝土的强度也能增加。
10.
Standard test method for water requirement of normal consistency setting time and soundness of the portland cement
GB/T1346-1989水泥标准稠度用水量、凝结时间、安定性检验方法
11.
A Balancing valve is used to regulate and measure the rate of flow of water.
流量平衡阀用于调节和测量水的流量。
12.
Real Time Flood Forecast and Regulation System in Yuanshui River;
沅水流域实时洪水预报调度系统研究
13.
It decreased greatly in heat when air conditioner is used.
用空调时,温度大减。
14.
Research and Application of Flow-Shop Scheduling Methods Based on Hybrid Quantum-Inspired Evolutionary Algorithm
基于混合量子进化算法的流水车间调度方法研究与应用
15.
Study on Process or Volume Control in Reservoir Operation and Forecasted Flood Operation Rule for Biliuhe Reservoir;
水库洪水调度峰量控制类型与碧流河水库防洪预报调度规则研究
16.
Study on the Administration System Innovation of the Temporary Land Reclamation in South-to-north Water Diversion Project at Shandong
南水北调东线工程山东段临时用地复垦实施管理制度创新研究
17.
A Study on Reservoir Joint Optimized Operation of Water Quality and Water Quantity in Arid Area;
内陆干旱区水库水质水量联合优化调度研究
18.
The water withdrawal will be equal to the water consumption if it reaches the maxima.
当取用水达到极值点时,取用水量等于耗水量。