1.
Going All-out to Forge Superquality works of Dongping Hydroproject;
精心施工 全力打造洞坪精品工程
2.
Analysis on Productive Test of Tensile Anchorage Bar in East Side-wall of Underground Power House of Dongping Hydroproject
洞坪水电站地下厂房东端墙张拉锚杆生产性试验分析
3.
Automatic control of long-distance feeding for aggregate storage bin of batching plant on left-bank of Dongping Hydropower Station
洞坪水电站左岸搅拌楼骨料仓远距离进料自动控制
4.
Only one ticket for the tourism bus during the sight viewing, you can get off or get in anytime and anywhere.
峨眉山景区实行观光车制度,游客可乘观光车去万年寺、洞坪等地,可随时上下车,一票制。
5.
A Study on the Prevention Techniques to Gas of the Diversion Tunnel in Zipingpu Hydro Project;
紫坪铺工程导流洞瓦斯防治技术研究
6.
he lost the hole when his approach rolled over the green.
当他的进球滑过草坪时他错过了一个洞。
7.
Stability Anslysis of Underground Cavern of Jiangping River Hydropower Station and Support Measure
江坪河电站地下洞室稳定性分析及支护措施
8.
Simulation analysis of stability of spillway tunnels of Jiangping River Hydropower Station
江坪河水电站溢洪洞围岩稳定性仿真分析
9.
An Analysis of Surrounding Rock Stability of Diversion and the Generating Tunnel of the Jiangpinghe Power Station
江坪河水电站引水发电洞围岩稳定性分析
10.
The Design and Research of Landscape Lighting in Dapingli Tunnel
大坪里隧道洞内景观照明的设计与研究
11.
ON TWO SPECIES OF CARYOMYS(CRICETIDAE,RODENTIA)FROM MIDDLE PLEISTOCENE ZHANGPING CAVES,LUONAN COUNTY,SHAANXI PROVINCE
记陕西洛南张坪洞穴群中更新世绒(鼠平)(Caryomys)
12.
Study on Model Test for Estimating Scouring in Bedrock during Ski-jump Energy Dissipation at End of 1# Spillway Tunnel of Zipingpu Project
紫坪铺1号泄洪排沙隧洞挑流基岩冲刷模型试验研究
13.
Research on Three-Dimension Visible Dynamic Manage System of Underground Hole-groups of SZP Hydropower Station Sichuan Province;
四川省狮子坪水电站地下厂房洞室群三维视化动态管理系统研究
14.
Research on the Optimized Design of the Excavation-mode and the Supporting-scheme on the Unfavorable Geology Tunnels of the Shiziping Hydroelectric Station;
狮子坪水电站不良地质隧洞开挖方式与支护参数优化研究
15.
3-D FEM Analysis of Diversion Tunnel Plug and Surrounding Rock s Stability of Zipingpu Hydro Project;
紫坪铺水利枢纽导流洞堵头及围岩稳定性三维有限元计算分析
16.
Application of portal lining jumbo in construction of bottom arch of diversion tunnel of Liuping Hydropower Station
自行式底拱衬砌台车在柳坪水电站引水隧洞施工中的应用
17.
Stability Analysis of Surrounding Rock of Sanliping Underground Powerhouse Group after Excavation
三里坪水电站地下厂房洞室群开挖后围岩稳定性分析
18.
Study on stripping time of steel-form-jumbo in construction of delivery tunnel of Liuping Hydropower Station
柳坪水电站引水洞边顶拱钢模台车拆模时间研究