1.
Two extra carriages were joined on at Nanjing.
在南京站加挂了两节车厢。
2.
Adjustment and Analysis of Ventilation and Air-conditioning System in the Nanjing Subway Station
南京站地铁通风空调系统调试与分析
3.
The Mutil-source Vibration Analysis of Steel Structure of BEIJING SOUTH STATION Waiting Hall;
北京南站站厅钢结构多震源振动分析
4.
The Shanghai-Nanjing express train goes straight to Nanjing without stop on the way.
上海到南京的特快客车直开南京,中途不停站。
5.
Construction Control Measures of Thin-wall Pipe Pile by Using Cast-in-place Concrete in South Nanjing Station of Beijing-Shanghai High-speed Railway
京沪高铁南京南站现浇薄壁管桩施工控制措施
6.
Structure Selecting and Design of Viaducts in Front of NanJing Railway Station;
南京火车站站前高架桥结构选型与设计研究
7.
Design and Construction for Arch Glass Curtain Wall of Beijing South Station Passenger Building
北京南站站房弧形玻璃幕墙的设计与施工
8.
Estimation of Influence on Jingnan Power Station by Normal Impoundment of Wangcun Power Station
旺村电站正常蓄水后对京南电站影响预测
9.
Construction points of glass curtain walls in central station buildingof Beijing Southern Station
北京南站中央站房玻璃幕墙工程施工要点
10.
Application of CCHP system in the South Beijing Railway Station
冷、热、电三联供系统在北京南站的应用
11.
Design of Zhongsheng Coach Terminal in Nanjing
五脉相通——南京中胜公路客运站设计
12.
Planning Design of Road Collection and Dispersion Transport System of Nanjing Railway South Station Integrated Hub
南京南站综合枢纽道路集疏运系统规划设计
13.
The South Station buiding of Beijing West Railway Station was constructed in1993. The name of the Station was written by comrade Jiang Zemin.
一九九三年承建的北京西客站南站房工程。江泽民同志题写站名。
14.
Application of engineering cost to scheme optimization of Beijing South Station;
工程造价在北京南站方案优选中的应用
15.
Research on Dynamic Simulation Method for Passenger Flow Organizations in Beijing South Railway Station
北京南站客流组织动态仿真分析方法研究
16.
Architectural Design of East Nanjing Road Station of Shanghai Rail Transit Line 10
上海轨道交通10号线南京东路站建筑设计实践
17.
On the supplementary measures and strengthening scheme of shield end well of a station in Nanjing city
南京某车站盾构端头井加固方案及辅助措施
18.
Analysis on Design of Atrium Structure of a Metro Station in Nanjing Constructed by Cut and Cover Method
南京某明挖地铁车站的中庭结构设计方法分析