1.
The Situ-Application ZMC-30 Side Unloading Coal Loading Machine
ZMC-30型侧卸式装煤机的应用分析
2.
Single-side tipping and curved rail wagon for metallic mines--Basic parameters and dimensions
GB/T2885.3-1981金属矿单侧曲轨侧卸式矿车基本参数及尺寸
3.
Locomotor Simulation and Optimal Design of Working Mechanism of Sides Dump Mucker;
侧卸装岩机工作机构运动仿真及优化设计
4.
Remove side bearings from differential case.
拆卸差速箱处的侧轴承。
5.
Remove the outer belt weatherstrip.
拆卸外侧防水饰条。
6.
Research on Lateral Unloading Stress Path and Wall Deformation For Foundation Pit;
基坑侧向卸荷应力路径及挡墙侧向变形研究
7.
Remove the inboard seatback pivot bolt.
拆卸内侧座椅背枢轴螺钉。
8.
belt conveyer with lateral discharger
带侧向卸料器的带式输送机
9.
Remove sidemarker socket from lamp.
从灯上拆卸侧面识别信号灯插座
10.
Accumulator Remove/Install Left-Hand Drive
贮积器拆卸/安装-左侧驾驶
11.
Remove differential side bearings from differential case.
从差速箱拆卸差速器侧轴承。
12.
Remove door inside handle actuator from door.
从车门上拆卸车门内侧手柄触发器。
13.
Remove L shape bracket from one side of air gap drain.
从气隙排放装置的一侧拆卸l型支架。
14.
Effect of Lateral Unloading on Foundation Pit Displacement
土体侧向卸荷对基坑支护位移的影响
15.
Design of Modular for Machining of Balance Holes on Gear Pump Side-plank
齿轮泵侧板卸荷孔加工组合机床设计
16.
If both strut assemblies are to be removed, mark the strut assemblies right or left according to which side of the vehicle they were removed from.
若同时拆卸两侧之支柱,应标示所拆下之支柱拆自那一侧。
17.
Engine Only: Remove the lower radiator hose at the water pump en
0公升引擎只能:于水泵端拆卸下侧散热器软管。
18.
The Optimal HVAC Load-Shedding Control on Demand-Side Management
电力需求侧管理中空调系统卸载最佳化设计