1.
Construction Monitoring of CFST Arch Bridges and Calculation during Erecting Steel Tubular Arch Rib;
钢管混凝土拱桥施工监控与拱肋吊装计算
2.
Hoisting Method for Large Product Tower and Dewatering Tower and Related Calculation
大型成品塔、脱水塔吊装方法与计算
3.
Research on the Computer Assistant Design of Awkward and Lengthy Cargo s Stowage;
重大件货物吊装及积载的计算机辅助设计研究
4.
Calculation of lateral buckling critical load of crossbeam on frame for hoisting blowout preventer. CPM
封井器吊装架横梁的侧向屈曲临界载荷计算
5.
Calculation of stayed buckle cable forces for concrete filled steel tubular arch bridge with long span in process of lifting
大跨度钢管砼拱桥拱肋吊装中的扣索索力计算
6.
Simulation Calculation of Arch Rib Hanging Construction and Aseismic Analysis of Large Span Arch Bridges;
大跨度拱桥拱肋吊装仿真计算与抗震分析
7.
On the Method of Computer--Aided Calculating and Analyzing in the Process of Hoisting and Installation;
推举法吊装的计算机模拟和分析方法的研究
8.
Study on Computation Method of Geometric Configuration Control for Long-span Arch Bridges Constructed by Cable-hoisting
大跨拱桥吊装施工线形控制计算方法研究
9.
Plan for Main Engine Hoisting of 32000DWT Log/Bulk Carrier
32000DWT散货船主机吊装及工装吊梁设计
10.
The Positioning System for Lifting Instruments in Container Cranes;
集装箱桥吊吊具定位系统的总体设计
11.
Calculation of Stayed-buckle Cable Force for Concrete-filled Steel Tubular Arch Bridge with Long Span during Lifting
大跨度钢管混凝土拱桥拱肋吊装中的扣索索力计算
12.
Space Simulation Analysis on the Rib-Hoisting Construction of Long-span CFST Arch Bridge;
大跨度钢管混凝土拱桥拱肋吊装施工过程空间仿真计算
13.
The Method of Simulation Calculation in the Stages of Raw Support Cable Hoisting of Long-span CFST Arch Bridge;
大跨度钢管混凝土拱桥无支架缆索吊装过程中的仿真计算分析
14.
Research and Implementation on Computer Control System of Sling Stretch Test Machine;
吊装带拉伸试验机计算机控制系统的研究与实现
15.
Analysis of Simulation Calculation on the Rib-hoisting Process of Long-span CFST Arch Bridge;
大跨度钢管混凝土拱桥拱肋吊装过程的仿真计算分析
16.
Erection of 1650 mm Mill,Hoisting of Housing and Design of Lifeing Beam is Stainless Steel Coal-rolling Mill in TISCO
太钢不锈冷轧厂1650 mm轧机安装、牌坊吊装及吊装梁的设计
17.
Features of Suspension Idlers and Calculation of Suspension Structure
吊挂托辊组的使用特点与吊挂结构计算
18.
The stress analysis and calculation for the 350 link elevator
350吊环设计过程中的应力分析及计算