说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 锚杆长度
1.
Discussions on Ultrasonic guided wave test length of bolting
超声导波检测锚杆长度若干问题的讨论
2.
Numerical analysis for effect of bolt length on stability of slopes
锚杆长度对边坡稳定性影响的数值分析
3.
Model experiment study on influence of anti-blast characteristics of rock bolt length on wall rock of underground cavern
锚杆长度对洞室抗爆性能影响的模型试验研究
4.
COMPREHENSIVE RESEARCH OF CRITICAL ANCHORAGE LENGTH PROBLEM OF ROD OF ANCHORAGE STRUCTURE
锚固类结构杆体临界锚固长度问题综合研究
5.
The Technique Focus of Designing Anchor Fixed Length-critical Anchoring Length is Not Suitable for Upper-limit of Anchoring Length
锚杆锚固段设计的一个技术焦点—临界锚固长度不宜作为锚固长度上限
6.
The Experiment Study of Full Grouting Bolt by Optical Fiber Grating Sensing;
基于光纤光栅测试的全长锚固锚杆实验研究
7.
Contrastive Study of Sectionalized and Wholly Grouted Anchor Load Transfer Machanism
多段型与全长粘结型锚杆锚固机理的对比研究
8.
Application of Tunnel Anchorage with Anchor Rods to Anchor System of the Second Yangtse River Bridge in Wanzhou City
隧道式锚碇加锚杆在万州长江二桥锚固系统中的应用
9.
The application of joint support technology of high strength anchor arm and anchor cable
高强度锚杆和锚索联合支护技术的应用
10.
Application of High strength Bolt and Cable Anchor Combined Supporting in Driving Fault Seam
高强度锚杆、锚索联合支护在过断层中的应用
11.
Apply Research of the Theory of Wholly Grouted Anchor Load Transfer Model;
全长粘结式锚杆传力模型及应用研究
12.
The Research about Detecting System Based on the ARM Microprocessor for Mining Anchor Bolt' Length
基于ARM的矿用锚杆测长系统研究
13.
Numerical Simulation of the Pullout Test of Wholly Grouted Cable
全长粘结式锚杆拉拔试验的数值实现
14.
Study on Anchor (Cables) Supporting in Large Span Section Open-off Cut;
大跨度切眼巷道锚杆(索)支护技术研究
15.
Research on the Automatic Delimited Angle System of CMM25-4 Type Bolt Drilling Cars
CMM25-4型锚杆钻车自动分度系统的研究
16.
Study on Causes and Measures of High-strength Bolt Supporting Failure
高强度锚杆失效原因分析及对策研究
17.
The Analysis of the Reliability and Design for Anchorage of Steels
钢板的锚固可靠度分析及设计锚固长度
18.
Friction forces of earth acting on the anchor bar of bridge dais have been measured as long as20 h on the spot.
本文对锚拉桥台的锚拉杆进行了长达20小时的现场监测试验。