说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 项目总成本
1.
Support requested from the TI Program as percentage of total project cost
需要技术进步项目支持的资金占项目总成本比例
2.
The Target Cost Management s Discussion on EPC General Contract Project;
EPC总承包项目目标成本管理探讨
3.
The Research on the Cost Control of the EPC Construction Project Contractor;
EPC建设项目总承包商的成本控制研究
4.
EPC Total Contract Cost Management Study;
EPC工程总承包项目成本管理研究
5.
Project Cost Risk in EPC Contract and It s Precaution;
工程总承包项目的成本风险及其防范
6.
Cost Control of EPC Contractor for Power Plant Project;
电站EPC项目总承包商的成本控制
7.
Research on Construction Project Cost Control of the Third Project Department of XX City Municipal Corporation;
XX市市政总公司第三项目部施工项目成本控制研究
8.
The Study of Cost Management in Information-Base Project of AQSIQ
基于质检总局信息化项目的成本管理研究
9.
Discussion about International Construction Project Cost Control under Design Construction General Contract
设计施工总承包条件下国际项目成本控制浅析
10.
To be acquainted with the Project Master Schedule for the assigned project.
熟知本人负责项目的项目总体计划。
11.
The paper studies the reasonable list price which reflects the actual cost of the hospital by relating the total cost of the hospital to the unit cost and the item cost.
将医院总成本同单位成本和项目成本联系 ,以反映医院的实际成本而获得合理的定价。
12.
Research on the Model of the Project Management in the Strategy of Overall Cost Leadership;
基于总成本领先战略的企业项目化管理模式研究
13.
Optimizing the Construction Project Management and Strengthening the Construction Cost Control;
优化施工项目管理 加强项目成本控制
14.
Enlightenment of engineering project cost control in Wuxi project department
梧西项目部工程项目成本控制的启示
15.
global low-cost sanitation project
全球低成本卫生项目
16.
To be acquainted with the Project Master Schedule and the Budget for the assigned project.
熟知本人负责项目的项目总体计划和预算情况。
17.
To be acquainted with the Project Master Schedule and the purchasing schedule for the assigned project.
熟知项目总体计划及本人负责项目的采购计划。
18.
My name is George, project manager and chief engineer of my company.
我是乔治,本公司项目经理兼总工程师。