1.
ON THE FUZZY DUE-DATE DECISION MODEL BASED ON MRP II;
基于MRP Ⅱ的模糊交货期决策模型研究
2.
Modified PSO Algorithm Solving Flow-shop Scheduling Problem with Fuzzy Delivery Time;
改进微粒群算法求解模糊交货期Flow-shop调度问题
3.
Quantum particle swarm optimization for flow-shop scheduling problem with fuzzy delivery time
用QPSO算法求解模糊交货期Flow-shop调度问题
4.
Research on cultural evolutionary algorithms applied to Flow Shop problem with fuzzy delivery time
模糊交货期Flow Shop调度文化进化算法研究
5.
Improved PSO algorithm for flow shop scheduling problem with fuzzy delivery time
模糊交货期Flow-shop调度问题的改进微粒群算法
6.
Production Planning with Fuzzy Due Data for Multi-Location OKP Manufacturing Systems;
基于模糊交货期分布式多工厂单件制造业的生产计划
7.
Optimal Scheduling Problem to Maximum the Number of Satisfied Customers about Fuzzy Due Date Windows;
模糊交货期窗口下极大化顾客满意数的最优调度
8.
The Application of Fuzzy Analysis Method in Futures Business Risk Analysis;
模糊分析方法在期货交易风险分析中的应用
9.
The Production Planning for Lot Size Manufacturing Systems with Earliness/Tardiness Due Date in Fuzzy Environments;
模糊环境下批量制造业提前/拖期交货的生产计划
10.
THE FUZZY COMPREHENSIVEEVALUATION WITH THE BEST-COMBINED WEIGHTABOUT THE MANAGEMENT LEVEL OF FUTURES BOURSE;
期货交易所管理水平最优组合赋权的模糊综合评价
11.
A Model to Prevent Spot Transaction Risk for Generation Company by Use of Electricity Futures and Analysis on Calculation Example;
发电商利用电力期货规避现货交易风险模型
12.
MODELSAND IMPLEMENTATION OF DAY- AHEAD AND FUTURESTRADE DECISION SCHEDULING SYSTEMS;
期货与现货交易计划决策系统的模型及实施
13.
Study on the Application of ARIMA model in time-bargain forecast;
ARIMA模型在期货交易预测中的应用研究
14.
Optimal Model of Transportation Terminal Based on Fuzzy Set and Multi-objective Programming;
基于模糊熵和多目标规划的公路货运交通枢纽布局模型
15.
Better delivery - Modular engineering speeds production.
更快的交货期-模块式工程部件缩短了生产周期。
16.
Research on Optimal Cross-hedge Ratio of Foreign Exchange Futures Based on DCC Model
基于DCC模型的外汇期货交叉套期保值比率估计
17.
Delivery schedule ( shipment) in weeksmonths from
交货期(从—起---周月)
18.
Delivery Time Model and Its Analysis Based on MTO Manufacturing Mode;
MTO生产模式的交货期决策模型及其分析