1.
Research on the Stability of High Slope of the Intake of Xiangjiaba Hydropower Station;
向家坝水电工程进水口高边坡稳定性研究
2.
VEGETATION RESTORATION IN DISTURBANCE AREA OF LARGE HYDROPOWER PROJECT--A CASE STUDY OF XIANGJIABA HYDROPOWER PROJECT
大型水利水电工程扰动区植被的生态恢复——以向家坝水电工程为例
3.
Study on Simulation and Optimization for the Construction Diversion Process of Xiangjiaba Hydropower Station;
向家坝水电站施工导流过程仿真与优化研究
4.
Gas safety and prevention in excavation construction of Xiangjiaba Hydropower Station
向家坝水电站开挖工程中的瓦斯安全预防
5.
Control blast technology for slope excavation works above EL. 300m on left bank of Xiangjiaba hydropower project
向家坝水电站左岸300m高程以上边坡开挖工程施工控制爆破技术
6.
Studies on Embankment Matials Test and Compacting Test of Shui Niujia Power-station Embankment Dam Project;
水牛家水电站大坝工程施工期筑坝材料试验及碾压试验研究
7.
Dynamic Visualization Construction Diversion of XiangJiaBa Hydroplant;
向家坝水电站施工导流动态可视化研究
8.
Resistance Monitoring in Construction of Caisson Foundation of Cofferdam of Xiangjiaba Hydropower Station
向家坝水电站围堰基础沉井施工下沉阻力监测
9.
Simulation Analysis on Navigation Indexes of Xiangjiaba Bridge by Ship Model Test
向家坝水电站施工大桥船模通航指数模拟分析
10.
Simulation and Optimization on the Dam Construction Schemes of Xiangjiaba Hydropower Station;
向家坝水电站大坝浇筑施工方案仿真分析与优化设计
11.
Dynamic Three-Dimension Visual Simulation for Xiangjiaba Hydroplant Dam Concrete Construction;
向家坝水电站大坝施工动态三维可视化仿真研究
12.
Stability Analysis Against Deep Sliding of the Dam Foundation of Two Dam Section for Xiangjiaba Hydropower Station;
向家坝水电站两个坝段坝基深层抗滑稳定分析
13.
Water power schemes (hydroelectric schemes) are of two types, high dams and low dams
水力发电工程(水电工程)有高坝和低坝两种类型。
14.
The link from the Xiangjiaba hydropower plant to Shanghai is scheduled for completion in 2011.
这条从向家坝水电站到上海的电力线预计在2011年完工。
15.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
16.
Investigation on stability against deep level sliding of Xiangjiaba hydrostation gravity dam
向家坝水电站重力坝深层抗滑稳定性研究
17.
Dam Partition Temperature Control for Left Bank of Xiangjiaba Hydropower Station
向家坝水电站左岸坝体分缝温度控制研究
18.
Study on Construction Simulation and Optimization for the Underground Powerhouse System of Xiangjiaba Hydropower Station;
向家坝水电站地下厂房系统施工仿真与优化研究