1.
Three Dimensional Simulation and Low-head Operation Stability of Longtan 700MW Turbine Runner
龙滩水电站700MW机组转轮水力计算及低水头运行稳定性优化分析
2.
Low-head Operation Stability Analysis of Laxiwa Turbine-generator Unit
拉西瓦巨型水轮发电机组低水头运行稳定性分析
3.
Study on the Turbine Operation of Ertan Hydropower Station Lowering Reservoir Water Level during Low Water Period
二滩水轮机枯水期降低水库水位运行研究
4.
The MPI's patented design of the M,H provides low-stress, horizontal motion by two, independent pairs of squaring jaws; all in a single, high-speed actuation.
MPI贴装头的设计提供了两对互不制约的中心夹以独立、高速的动作进行低压力,水平地运动。
5.
Vibration of low-head radial gate is a very complex that has become a hidden problem affecting the safety operation of water project.
低水头弧形闸门振动是一个非常复杂的问题,是影响工程安全运行的一大隐患。
6.
The Research on Risk Management of Construction Diversion of Low-head Navigational Junction;
低水头航运枢纽工程施工导流风险管理研究
7.
Study on the process of the SBR wastewater treatment system with low temperature
低温下SBR污水处理工艺运行研究
8.
Wu Lei Tau Lowland Raw Water Pumping Station
狐狸头低地原水抽水站
9.
low-head axial flow water-turbine pump
低水头轴流式水轮泵
10.
Running result and the monitoring and testing of low-pressure boilers water-treatment equipment
GB/T16811-1997低压锅炉水处理设施运行效果与监测
11.
Study on Security of Water Circulation under Low Load Operation of 300MW Boiler;
300MW锅炉机组低负荷运行水循环安全性研究
12.
Research of reliability and safety for the steam boiler running under the condition of low-load;
蒸汽锅炉低负荷运行对水动力可靠性的影响
13.
The Damage to Fuel Boiler in Low Temperature and Protecting Measures;
低温运行对燃油热水锅炉的危害及防治措施
14.
Orbal Oxidation Ditch Process Commissioning in Wastewater Treatment Plant at Low Temperature
低温条件下奥贝尔氧化沟污水厂调试运行
15.
Enhanced Biological Nitrogen Removal at Low-temperature Based on Operation Data of Wastewater Treatment Plants
基于污水厂运行数据的低温生物脱氮强化研究
16.
Startup and Debugging of Modified Oxidation Ditch in Low Temperature and Low Influent Quantity
低温低水量负荷改良型氧化沟工艺的启动与试运行
17.
TECHNOLOGICAL DESIGN AND OPERATIONAL PRACTICE FOR BAOTOU NORTHERN SUBURBAN WATER PURIFICATION PLANT
包头市北郊水质净化厂工艺设计与运行
18.
Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;
南水北调东线一期工程源头泵站优化运行研究