1.
The Research on the Transition Behaviors of Mechanics during the Center Drift Method in Subway Station Construction;
地铁车站中洞法施工力学行为的研究
2.
Technology of Three-arch Structure Subway Tunnel Construction in Sand and Gravel
砂层中三联拱暗挖地铁隧道中洞法施工技术
3.
2. Values of ground surface settlement during side cavern cutting occupy total settlement values more than 50% in the construction of CRD method;
2.中洞法施工中,侧洞开挖引起的地表沉降占总地表沉降量的50%以上;
4.
Numerical Imitation Analysis of Ground Surface Settlement in CRD Method Construction of Tiantan-East Station of Beijing Subway
北京地铁天坛东门站中洞法施工地表沉降数值模拟
5.
On limestone cave disposal methods in bridge pile foundation projects
浅谈桥梁桩基施工中的溶洞处理方法
6.
APPLICATION OF SOIL FREEZING REINFORCEMENT METHOD TO SHIELD TUNNELING ENTRY
冻结法加固在盾构进洞施工中的应用
7.
Numerical Analysis for Secondary-lining of Subway Station Tunneled in Center Drift Method;
中洞法开挖的地铁车站二衬结构施工受力分析
8.
Analysis and Study on Flat Slab with Opening for Cover and Excavation Top-Down Method;
盖挖逆作法施工中预留孔洞的分析与研究
9.
Application of the large span shallow underground excavated cave pile method in subway construction
大跨度浅埋暗挖洞桩法在地铁施工中的应用
10.
Initial analysis on application of New Austrian method on Liangtouwu tunnel entering cave construction
浅谈新奥法在两头乌隧道进洞施工中的应用
11.
Application of New Austrian Tunneling Method to construction of diversion tunnel for Dalong Water Control Project
新奥法在大隆水利枢纽工程导流隧洞施工中的应用
12.
New Technique and New Methods Used in Construction Survey for Headrace Tunnel at Shiziping Hydropower Station
浅谈狮子坪水电站引水隧洞施工测量中的新工艺、新方法
13.
The Application of Shield Tunneling Method in No. 5 Tunnel of Luohui Canal;
谈洛惠渠五洞工程手掘式盾构法施工
14.
Application of Two Tunnel Boring Projects Based on Environmental Friendly Views
“零仰坡”进洞法与盖挖法在环保型隧道施工中的应用
15.
Application and Discuss of CRD Method Used in Chongwen Gate Station on the Fifth Line of Beijing Subway
中洞法在北京地铁5号线崇文门站施工中的应用
16.
IMPROVEMENT AND APPLICATION OF ANN METHOD IN STRESS AND DEFORMATION PREDICTIONS DURING TUNNEL EXCAVATION
神经网络方法在洞室施工期应力及变形预测中的应用及其改进
17.
Construction method of the circle-shear type portal of the Senkeng second tunnel
森坑二号隧道圆切式洞门的施工方法
18.
Study on Ground Settlement Due to Subway Construction with Cavern-Pile and CRD Method;
洞桩法及CRD工法地铁施工对地表沉降影响研究