1.
The Nature and Consequence of Making Bold to Change the Bidding Conditions after Deciding the Bidding;
定标后擅自变更招投标条件的性质和后果
2.
Normally, no bidder should be permitted to alter his bid after bid has been opened.
一般来说,在开标后,任何投标者都不能修改投标。
3.
temperature-hysteresis effect of standard cel
标准电池温度滞后效应
4.
final advance directional sign
最后预告方向指示标志
5.
a symbol that is the result of printing.
打上印记后留下的标记。
6.
a punctuation mark (!) used after an exclamation.
感叹句后面的标点(!)。
7.
composite index of lagging indicators
滞后经济指标综合指数
8.
The deadline for compliance is 2000.
达标的最后限期是2000年。
9.
No bidder shall is permit to alter his bid after the bid have is open.
开标以后,任何投标人都不准再修改投标。
10.
Mail either unread or flagged for follow up
未读邮件或是标有后续标志的邮件
11.
I will always raise my goals as soon as they are attained.
目标达到后再定一个更高的目标。
12.
Discuss on the bidding without basic price in building industry after China entered into WTO;
论我国建筑业加入WTO后的无标底招标
13.
Note the ?er ending in the following words.
标出下面单词后面的er后缀。
14.
The tenderer shall sign and keep the bid documents when receiving and may not open them.
招标人收到投标文件后,应当签收保存,不得开启。
15.
Click a heading, or press the TAB key to highlight a heading, and then press ENTER.
单击标题,或按 TAB 键来突出显示标题,然后按 ENTER 键。
16.
I'll transmit the coordinates to our new target as soon as I return to the hive.
我回到母舰后 就把新目标的坐标发过来
17.
Position the cursor in the box in which you want to attach the new box(es) and then press the mouse button.
将光标放在要添加新图框的位置,然后单击鼠标。
18.
When you attain one goal,set a new one.
当你达到一个目标之 后,再设定一个新目标。