说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高洪水位
1.
During the period of high flood stage, it is easy to cause lots of dangerous situations in those dams in which exist ants hidden dangers, such as seperation seek, piping, collapse and landslide, etc.
高洪水位期间,存在蚁害隐患的堤坝易出现散浸、管涌、跌窝和塌坡等险情。
2.
Analysis of Engineering Benefit of Hongze Lake Raising Water Level of Sluice;
南水北调东线洪泽湖抬高蓄水位工程效益分析
3.
The water level at Chenglingji Hydrometric Station on Dongting Lake was kept over warning water level and flood peak appeared on August 24, being the fourth highest water level since the establishment of the station in 1904.
洞庭湖城陵矶水文站持续超警并在24日出现洪峰,为1904年建站以来第四高洪水水位。
4.
The flood rose to a level of 50 feet.
洪水涨到五十英尺高。
5.
The flood peak water level at Hukou Hydrometric Station on Poyang Lake appeared on August 28, 1.12 meters higher than the warning water level, being the highest since the flood started this year.
鄱阳湖湖口水文站28日出现洪峰水位,超警戒1.12米,为今年入汛以来最高水位。
6.
Analysis of effect of application of Honghu flood diversion area on lowering water level of the Yangtze River
洪湖分蓄洪区启用对降低长江水位效果分析
7.
"The water table is so high at the moment that even small amounts of rainfall could lead to local flooding," a Met éireann spokesman said.
“国家气象局的一位发言人说:“这个时刻水位这么高,小小的降雨量也可以导致局部洪水。”
8.
The floods had spread and the water was rising fast.
那里洪水泛滥,水位正在急剧上升。
9.
The floods are sinking rapidly.
洪水正在急退中〔水位迅速降低〕。
10.
ANALYSIS OF WATER LEVEL RELATION OF THE LAKE, THE CANAL AND THE CHANGJIANG RIVER DURING LOW WATER IN HONGHU LAKE AREA
洪湖地区长江枯水期湖、渠、江水位分析
11.
Application of relevant water level method in flood forecasting
浅谈相应水位法在洪水预报中的应用
12.
Research Flood Releasing Safety of Flood Discharge Structure with High-head & Large-discharge
高水头大流量泄洪建筑物的泄洪安全研究
13.
The water moved up like a sea.
洪水升高了,像海水涨潮一般。
14.
The Legend of Dayu and the legendary Flood Story in Gaoshan Ethnicity in Taiwan;
大禹治水传说与台湾高山族洪水神话
15.
A plain bordering a river and subject to flooding.
漫滩位于河边的、易被洪水淹没的平地
16.
Research of Flood Control Program and Level for Big and Medium Reservoirs in Beijing Workshop;
北京市大中型水库洪水调度及汛限水位的研究
17.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
18.
Evaluation of Historical Floods on the River with Variable Bed According to the Difference of Rising Stage
在变动河床上以水位最大涨差推求历史洪水