说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 拆模时间
1.
The Study of Early-dismantling Template System and Dismantling Template Time of Concrete Structure;
混凝土结构早拆模板体系与拆模时间的研究
2.
Study on stripping time of steel-form-jumbo in construction of delivery tunnel of Liuping Hydropower Station
柳坪水电站引水洞边顶拱钢模台车拆模时间研究
3.
Short cycle times can be achieved by detaching the mold plates before the concrete is completely set up.
在混凝土完全硬化之前拆模可以缩短周期时间。
4.
Calculation Design of Supporting System of Floor Bottom Formwork and Time Control of Formwork Removal
浅谈楼板底模支撑系统计算设计及拆模的时间控制
5.
remove a barrier between
拆除在...中间障碍
6.
While the beams were being detached, a heavy wind arose.
拆梁时,起了强风。
7.
Maximum Pseudo-Likelihood Estimation of Interest Rate Models for China Interbank Offer Rate;
中国银行间拆借利率扩散模型的极大拟似然估计
8.
ARMA-GARCH Models and the Application of VaR Method to Chinese Inter-bank Borrowing Interest Rate
ARMA-GARCH模型及VaR方法在我国银行间同业拆借市场中的应用研究
9.
It seems oil has been leaking from this pipe for some time. We'll have to take the machine apart to make it right.
(油从这支管子渗漏有一段时间了,我们得把机器拆开修好它。
10.
Two-Machine Mixed Shop Problem with Setup,Processing and Removal Time Separated
安装、加工和拆卸时间分离的两台机器混合作业问题(英文)
11.
Study on time differences of taking out corneal suture between xenogeneic full-thickness lamellar keratoplasty and anterior lamellar keratoplasty
异种全厚板层角膜和前板层角膜植片板层移植术后拆线时间探讨
12.
Numerical Simulation Analysis of Removal of Temporary Supporting and Construction of Secondary Lining of Large-span Tunnel
大跨隧道临时支护拆除及二次衬砌施工数值模拟分析
13.
london interbank offered rate
伦敦银行间拆放款利率
14.
LIBOR(London Interbank Offered Rate)
伦敦银行间拆放款利率-
15.
An interval of one day had been left between the viewing and the sale in order to give the upholsterers enough time to take down the hangings, curtains and so forth.
在参观和拍卖之间有一天空隙时间,这是留给地毯商拆卸帷幔、壁毯等墙上饰物用的。
16.
Door Module Remove/Install
车门模组拆卸/安装
17.
KEY OFDISCONNECT TRANSMISSION CONTROL MODULE.
关闭。拆开变速控制模组。**
18.
Remove the door module from the trim panel.
从饰板上拆卸车门模组。