说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 孔板泄洪洞
1.
Experimental Investigation and Numerical Simulation of Cavitation Inception in Flood-Discharge Tunnel with Orifices;
孔板泄洪洞空化初生试验及数值模拟研究
2.
Study on cavitation characteristic of working gate slots in middle spillway tunnel of Jishixia hydropower station
积石峡水电站中孔泄洪洞平板工作闸门槽空化特性研究
3.
Study on Body Type Optimization of Gate Slot of Jishi Gorge Middle Orifice Discharge Hollow;
积石峡中孔泄洪洞工作门槽体型优化研究
4.
Construction of the Crown Concrete of the Intersection Section of Diversion Tunnel and Middle Flood Discharging Tunnel in the Jishi Gorge Hydropower Station
积石峡水电站导流洞与中孔泄洪洞交叉段顶拱混凝土施工技术
5.
Test of Cavitation Characteristics on Service Gate Slotss for Middle Outlet Works in Jishixia Hydropawer Sation;
积石峡水电站中孔泄洪洞平面工作闸门槽空化特性试验研究
6.
Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir
洞河水库双曲拱坝表孔泄洪消能问题的试验研究
7.
Aseismatic Analysis and Optimization Design for Inlet of Diversion Tunnel;
导流泄洪底洞进口段抗震及优化分析
8.
3-D Numerical Simulation on Flood Discharge Tunnel with High Water Head and Free Water Surface;
高水头明流泄洪洞三维数值模拟研究
9.
Talking about the Engineering Geological Condition of Spillway Tunnel of Qianian Reservoir and Its Evaluation
千年水库泄洪洞工程地质条件及评价
10.
Design and Research on Flood-Discharge Power-Generating Hole of Baiyekou Reservior
柏叶口水库泄洪发电洞的设计与研究
11.
Shape optimization test of Dabeigou spillway reservior desilting tunnel
大北沟水库泄洪排沙洞体型优化试验
12.
Research and design for the transition section of the flood discharge tunnel with pressure
有压泄洪隧洞出口渐变段设计与研究
13.
Research on Hydraulic Characteristics of Reconstructing Diversion Tunnel to Permanent Spillway Tunnel;
导流洞改建泄洪洞衔接段水力特性研究
14.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱坝泄洪孔支承结构工作性态分析
15.
Restoration of damaged base-slab of spillway chute of Siping Hydroproject
寺坪水电枢纽溢洪道泄槽底板的修复
16.
Analysis of the Dangerous Area Caused by Hole Leak and Dispersion in LNG Tank
LNG储罐孔洞泄漏扩散危险区域分析
17.
On Some Hydraulie Problems in Water Tunnelsof High Tailings Dams
高尾矿坝泄洪洞若干水力学问题的探讨
18.
Controlled demolition blasting technology for thin reinforced concrete wall of a flood discharging tunnel
泄洪洞钢筋砼高薄边墙切割拆除控制爆破技术