1.
On construction of TBM machine in tunnel
浅谈硬岩双护盾掘进机(TBM)隧洞施工
2.
Application of Filling Grouting into Pea Gravel of Tunnel Construted by TBM
豆砾石回填灌浆技术在双护盾掘进机隧洞施工中的应用
3.
On Measures to Overcome Difficult Encountered in Weak Stratum during Construction Stage of Tunnel Built by Double-shield Tunnel Boring Machine
双护盾全断面掘进机(TBM)遇软岩洞段的解困方案
4.
Application Research of Shield Tunnel Boring Machine on Soft and Hard Rock Engineering in Osaka Tunnel
双护盾全断面掘进机在大坂隧洞软硬岩工程中的应用研究
5.
Poor-geology consolidation grouting in double-shielded TBM full face tunnelling
双护盾TBM全断面掘进不良地质洞段固结灌浆
6.
On Controlling Technique of Ground Settlement during the Double-o-tube (DOT) Shield Excavation
双圆盾构掘进中的地面沉降控制技术
7.
Research on Key Technology for Thrust System of Shield Tunneling Machine;
盾构掘进机推进系统的关键技术研究
8.
Study and Preparation on the Special Tool of Tunneling Shield
盾构掘进机用特种刀具的研究与制备
9.
Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;
盾构掘进机异形断面隧道切削机构的理论研究
10.
Design Method of Segment Erector Mechanism for Shield Machine;
盾构掘进设备中的管片拼装机机构设计方法
11.
The shield mechanical driving adaptability analysis of composite formation in Guangzhou subway
广州地铁复合地层中盾构机掘进适应性分析
12.
Study on Shield Drilling Technology for Shielding Section of Kecun Station-Datang Station on GuangZhou Metro Line 3.;
广州地铁三号线客村~大塘盾构区间盾构机掘进技术研究
13.
Application of Double Fans and Dual "Sanzhuan" Power Supply Loops at Heating Face
双风机“双三专”电源在掘进工作面的应用
14.
Hydraulic System Maintenance of Boom-type Roadheader
EBZ160悬臂式掘进机液压系统的维护
15.
The experimental results showed that the designed hydraulic systems could meet the tunnelling requirements of shield at all kinds of geological conditions.
试验结果表明所设计的液压系统可以满足盾构掘进机在各地层中模拟掘进的要求。
16.
The Design of φ520mm EPB Model Shield Machine and the Simulation of the Tunneling Test Control;
φ520mm土压平衡式模型盾构机研制及试验性掘进控制模拟
17.
Development and Application of the Combined Method of Automatic Total Station and Gyroscope in Shield boring Measure
测量机器人与陀螺仪组合导向系统在盾构掘进中的开发和应用
18.
Research on the technical status of the segment-erection system for the full shield tunneling machine
全断面盾构掘进机管片拼装系统的技术现状研究