1.
The earthquake made the roadbed cave in.
地震后路基沉陷了。
2.
Analysis of foundation sinking reason of G208 highway and the processing plan
G208线路基沉陷原因分析及处理方案
3.
The Reason and Preventative Measures for Abutment Roadbed Subsidence
桥台背路基沉陷病害原因及防治措施
4.
The Research on the Settlement Controlling of High-speed Railway Embankment in Collapsible Loess Ground
湿陷性黄土地区高速铁路路基沉降控制研究
5.
Treatment Technology and Settlement Prediction on the Collapsibility Loess Foundation of Ningxia Highway
宁夏公路湿陷性黄土地基处治及沉降预测研究
6.
Numerical Analysis of Ground Settlement in Mining Areas Under the Railway
矿区铁路下开采引发地基沉陷的数值分析
7.
The Research on the Settlement Controlling and Geotechnical Centrifuge Tests of Piled Embankment in Collapsible Loess Ground of High-speed Railway;
湿陷性黄土地基高速铁路桩承式路堤离心模型试验及沉降控制研究
8.
Analysis on and the Prevention of the Pavement Pression around the Inspection Well of Municipal Road
市政道路检查井井周路面沉陷分析及防治措施
9.
Simulization and Visuanlization of Mining Subsidence Based on GIS;
基于GIS的开采沉陷计算与数据可视化
10.
Model of compensation for coal mine subsidence based on BP neural network;
基于BP神经网络的煤矿沉陷补偿模型
11.
Forecast and Analysis of Mining Subsidence Area Based on MATLAB
基于MATLAB的开采沉陷区预测分析
12.
On mining subsidence anticipate analysis on the base of probability-integral method
基于概率积分法的开采沉陷预计分析
13.
Early warning system of mining subsidence damage based on ARCGIS
基于ARCGIS的矿山开采沉陷灾害预警系统
14.
On the Cave-in System in Coal Mining on the Basis of GIS
基于GIS对煤矿开采沉陷系统的研究
15.
Research on the Sedimentation Mechanism and Control Method for High Embankment of Collapsible Loess;
湿陷性黄土高路堤沉降机理及控制方法研究
16.
Expressway bridge subsidence and control of structure layer elevation of bridge deck
高速公路桥梁沉陷及桥面结构层标高的控制
17.
Simulation Analysis on Ground Subsidence at the Poles of Transmission Lines Affected by Mining
受采矿影响输电线路杆塔处地面沉陷仿真分析
18.
Research on Settlement of Embankment Mechanism and the Most Differential Settlement Index Value;
路基沉降机理与超限沉降标准的研究