说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 硬岩隧道
1.
Advance Bottom Heading Technology Applied in Hard Rock Mountain Tunnels with Large Cross-section
下导洞超前施工技术在大断面山岭硬岩隧道中的应用
2.
The design of blasting control of the hard rock in large cross-section undersea tunnel
超大断面海底隧道硬岩控制爆破设计
3.
Introduction to the Management of Rapid Construction in Extra Long Tunnel under Hard Rock by Parallel Adit Drilling and Blasting Method
浅谈硬岩特长隧道平导钻爆法快速施工的管理
4.
Monitoring Study on Blasting Vibration by Excavation of Large Cross-Section Shallow Urban Tunnel Constructed in Hard Rock Mass
城市浅埋硬岩大跨隧道开挖爆破振动监控研究
5.
Design and Rapid Construction of Tsingtao Yangkou Large Section Tunnel in Hard Rock
青岛仰口硬岩大断面隧道的设计和快速施工
6.
The railroad passenger transportation special line hard rock extending cross section tunnel CRD method construction
铁路客运专线硬岩扩大断面隧道CRD法施工
7.
A study of the stability of a deep-buried hardrock tunnel with low horizontal ground stress
深埋低水平地应力硬质岩隧道稳定性研究
8.
Rapid construction of horniness phyllite area in Baojia hill tunnel
包家山隧道硬质千枚岩段快速施工技术
9.
A machine that bores through hard surfaces, used especially for tunneling through rock.
凿岩机一种钻孔于坚硬表面的机器,尤用作凿穿岩石的隧道
10.
Research on the Minimum Rock Cover Thickness of Underwater Tunnel in Alternating Layers of Hard and Soft Rocks;
软硬岩交互地层水下隧道最小岩石覆盖层厚度研究
11.
MECHANICAL CHARACTERISTICS AND TREATMENT METHOD OF COLLAPSE OF TUNNEL WITH HALF-HARD AND HALF-SOFT ROCKS ALONG ITS TRANSVERSE SECTION
半硬半软岩隧道塌方的力学特性及处理方法分析
12.
On construction of TBM machine in tunnel
浅谈硬岩双护盾掘进机(TBM)隧洞施工
13.
STABILITY OF THE ANCHORAGE WALL ROCK OF TUNNEL FOR CHONGQING EGONGYAN BRIDGE
重庆鹅公岩大桥隧道锚碇围岩稳定性
14.
Analysis of Surrounding Rock Stability of Soft Rock Tunnel and Study on Its Supports;
软岩隧道围岩稳定性分析与支护研究
15.
Methods for surrounding rock sub-classification of road tunnels
公路隧道岩质围岩亚级分级方法研究
16.
The treatment of rock dissolving the region under tunnel construction
浅谈岩溶地区隧道施工中的岩溶处理
17.
The usual technique for tunneling through hard rock is to drill holes in the face of the heading.
在坚硬的岩石中挖掘隧道通常用的技术是在掌子面上打洞,然后在洞里填满炸药。
18.
Study on Influence of Karst Water to Tunnel in Shi-Tai Passenger Dedicated Railway
石太客运专线特长隧道岩溶水对隧道影响研究