1.
Analysis and Research on Blending Coal Combustion Performance of DaTang Panshang Power Plant 2×600MW Boiler;
大唐盘山电厂2×600MW锅炉混煤燃烧优化分析与研究
2.
Research on Water Level Adjustment of Deaerator Operation in Tianjin Datang Panshan Power Plant
大唐盘山电厂除氧设备运行中水位突变问题解决
3.
Analysis for Shutdown of 100 MW and Below Generating Units in Datang Changshan Thermal Power Plant;
大唐长山热电厂100MW及以下机组关停分析
4.
Analyze the Heat Supply Pattern of Thermal Power Plant in TangShan-xinqu and Research in Its Ameliorative Scheme;
唐山新区热电厂供热方式分析及改造方案研究
5.
Post-Evaluation for Phase Eight Extension Project of Datang Baoding Co-Generation Power Plant;
大唐保定热电厂八期扩建工程项目后评价
6.
Environmental Impact Assessment of Thermal Power Plant Extension Project in DaTang WeiShui;
大唐微水发电厂扩建项目环境影响评价研究
7.
On Sinking Well Construction of Circulating Water Bumping Room of Ningde Power Plant in Datang, Fujian
福建大唐宁德电厂循环水泵房沉井施工
8.
Anticorrosion Measures of Steel Structure in Datang Yantan Hydropower Station
大唐岩滩水力发电厂金属结构的防腐蚀措施
9.
Operation summary on the design of the Datangweihe power plant ash removal system
大唐渭河发电厂除灰渣系统设计运行小结
10.
Karst Development Law and Treatment Measures of Foundation in Datang Power Plant,Linzhou
大唐林州热电厂岩溶发育规律及地基处理方案
11.
TEST STUDY OF DX PILES WITH SINGLE AND DOUBLE BULBS AT TANG SHAN HTW ELECTRIC PLANT
唐山HTW电厂工程单节和两节DX挤扩灌注桩的试验研究
12.
The calculation analysis of the generator's negative sequence capacity for the third term project in Ningxia Daba Power Plant of Datang International Co.,Ltd.
宁夏大唐国际大坝三期电厂发电机负序能力计算分析
13.
Construction Experiences of Dabieshan Power Plant 2×640 MW Unit Project
大别山电厂2×640MW机组工程建设经验
14.
Model Building and Application Research of Management Information System for Datang Panshan Power Plant 2×600MW Units;
大唐盘电2×600MW机组管理信息系统模型建立与应用研究
15.
Somewhat lower temperature phenomenon of main steam has been existing for a long time on boiler on.5 in Datang Taiyuan Co-generation Power.
大唐太原第二热电厂5号炉长期以来存在著主蒸汽温度偏低现象。
16.
Study of Production Management and Financial Benefit Post Evaluation of Datang Leiyang Power Plant Construction Project;
大唐耒阳发电厂建设项目生产及财务后评价研究
17.
Study on Overall Equipment Management Taking Security as the Centre about Datang Lueyang Power Plant;
大唐略阳发电厂以安全为中心的全面设备管理研究
18.
Control on Schedule and Quality during Engineering Regulation Process for Tuoketuo Power Plant, Phase II;
大唐托克托电厂二期工程调试过程中工期和质量的控制